PT GMT Indonesia<br />

<strong>Mewet</strong> <strong>Vein</strong> : <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong><br />

9<br />

9.1<br />

DRILLING PROGRAMME<br />

Available Data<br />

9.1.1<br />

Drill Hole Logs<br />

The drill hole logs were coded <strong>and</strong> validated to remove inconsistent lithological abbreviations to<br />

endure <strong>the</strong> database was consistent for plotting. The present lithology abbreviations used by<br />

JCM are very similar to <strong>the</strong> old lithology coding used by Ivanhoe, <strong>the</strong>refore, <strong>the</strong> correlation was<br />

made easily <strong>and</strong> no major coding discrepancies were noted.<br />

The lithology logs were imported into an Access database for archiving <strong>and</strong> analysis.<br />

9.1.2<br />

Core Photographs<br />

All core photographs have been collected from both phases <strong>of</strong> drilling <strong>and</strong> <strong>the</strong> JCM core<br />

photography is complete <strong>and</strong> archived in a digital format. The old Ivanhoe core photography is<br />

available as scanned digital photos <strong>and</strong> original 35mm film-based photographs with negatives.<br />

9.1.3 Drill Hole Data<br />

The current database for <strong>the</strong> <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong> contains 115 drill holes in different areas <strong>of</strong> <strong>the</strong><br />

vein system. From <strong>the</strong>se holes, 26 drill holes for an advance <strong>of</strong> 3,901.52 metres (JM001 to<br />

JM026) with a fur<strong>the</strong>r 89 drill holes, prefixed JCM###, completed in <strong>the</strong> second phase <strong>of</strong> drilling<br />

by JCM for an advance <strong>of</strong> 8,273.03 metres. The drilling in <strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong> was all oriented to<br />

<strong>the</strong> east, with <strong>the</strong> original drilling on 50 metre sections. Hole inclinations ranged between 55-70°<br />

but were mostly inclined at 60°.<br />

Of <strong>the</strong>se, <strong>the</strong> drill holes considered in <strong>the</strong> data assessment are outlined in Table 3 <strong>and</strong> 4.<br />

Hole Easting (m) Northing (m) Elev. (m) Depth (m) Azimuth Inclin<br />

JM011 497961.0 356449.0 56.0 186.00 090 -55<br />

JM012 497931.0 356449.0 59.0 115.70 090 -60<br />

JM013 497972.0 356386.0 59.0 117.00 093 -60<br />

JM014 497956.0 356495.0 56.0 77.50 093 -60<br />

JM015 497927.0 356333.0 55.0 102.00 090 -60<br />

JM016 497927.0 356391.0 56.0 93.60 090 -60<br />

JM017 497915.0 356496.0 55.0 102.00 090 -60<br />

JM018 497879.0 356457.0 56.0 209.95 090 -60<br />

JM019 497829.0 356457.0 56.0 224.00 090 -60<br />

JM020 497801.0 356457.0 56.0 255.00 090 -62<br />

JM021 497902.0 356347.0 55.0 153.00 090 -70<br />

JM022 497888.0 356391.0 56.0 190.05 090 -65<br />

Total (m) 1,825.80<br />

Table 3. Drill holes included in <strong>the</strong> assessment from <strong>the</strong> JM series <strong>of</strong> diamond drill holes (Ivanhoe<br />

drilling).<br />

The early drill holes by Ivanhoe were generally surveyed down hole using a Eastman Single<br />

Shot down hole camera. The original discs are still available from this programme <strong>and</strong> are<br />

archived in Jakarta. The second round <strong>of</strong> drill holes were not surveyed down hole, as most <strong>of</strong><br />

<strong>the</strong> drill holes were short (approximately 70 metres for scout holes). However, <strong>the</strong> deeper drilling<br />

on <strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong>, particularly for smaller diameter drilling, it would be expected that <strong>the</strong> drift <strong>of</strong><br />

0065 JCM/GEO/2009.04 Page 27