17.03.2014 Views

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PT GMT Indonesia<br />

<strong>Mewet</strong> <strong>Vein</strong> : <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong><br />

11.5<br />

• section 356,500N, below JCM-067 to test <strong>the</strong> plunging shoot to <strong>the</strong> north on <strong>the</strong> vein<br />

structure <strong>and</strong> extending at <strong>the</strong> same level one section north again to 356,575N below<br />

hole number JCM-074.<br />

Exploration Target<br />

The assessment <strong>of</strong> data has outlined an exploration target <strong>of</strong> between 900,000-950,000 tonnes<br />

<strong>of</strong> <strong>mineralisation</strong> with a gold grade <strong>of</strong> approximately 3 g/t <strong>and</strong> an accompanying silver grade <strong>of</strong><br />

approximately 3 g/t. This target is limited between 356,270 mN to 356,520 mN, approximately<br />

250 metres <strong>of</strong> strike length <strong>of</strong> <strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong> <strong>and</strong> between <strong>the</strong> surface <strong>and</strong> <strong>the</strong> extent <strong>of</strong> drilling<br />

at depth. There remains potential to increase <strong>the</strong> size <strong>of</strong> <strong>the</strong> target by drilling along <strong>the</strong> strike <strong>of</strong><br />

<strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong>, both to <strong>the</strong> north <strong>and</strong> south.<br />

0065 JCM/GEO/2009.04 Page 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!