17.03.2014 Views

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PT GMT Indonesia<br />

<strong>Mewet</strong> <strong>Vein</strong> : <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong><br />

Metallurgical testwork 3 months $ 100,000.00<br />

Geotechnical studies 3 months $ 150,000.00<br />

Environmental studies 9 months $ 150,000.00<br />

Resource estimation 3 months $ 100,000.00<br />

Scoping Study 3 months $ 500,000.00<br />

Logistical Support <strong>and</strong> Administration 12 months $ 750,000.00<br />

Tenement management $ 50,000.00<br />

Total $ 3,445,000.00<br />

Table 9. Work programme <strong>and</strong> budget required to advance <strong>the</strong> project<br />

Additional control on future drilling, surveying <strong>of</strong> collar locations <strong>and</strong> completing down hole<br />

surveys will assist in increasing <strong>the</strong> confidence levels <strong>of</strong> <strong>the</strong> geological model but additional<br />

drilling will be required down dip <strong>and</strong> between sections that currently remain at 50 metre centres<br />

to close to at least 25 metre pierce-points. At this stage, a re-evalaution <strong>of</strong> <strong>the</strong> drilling data <strong>and</strong><br />

modelling is recommended to be completed.<br />

0065 JCM/GEO/2009.04 Page 40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!