17.03.2014 Views

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

Geology and mineralisation of the Mewet Vein, Jelai Gold Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PT GMT Indonesia<br />

<strong>Mewet</strong> <strong>Vein</strong> : <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong><br />

13<br />

RECOMMENDATIONS<br />

The following recommendations are made for <strong>the</strong> ongoing work programme at <strong>the</strong> <strong>Jelai</strong> <strong>Gold</strong><br />

<strong>Project</strong>:<br />

1. The area has demonstrated sufficient data to attempt a resource modelling study on<br />

certain segments <strong>of</strong> some <strong>of</strong> <strong>the</strong> better defined veins.<br />

2. The addition <strong>of</strong> data in <strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong> area would raise <strong>the</strong> confidence <strong>of</strong> <strong>the</strong> geological<br />

model <strong>and</strong> <strong>the</strong> management <strong>of</strong> some issues, such as poor core recovery in some drill<br />

holes, will give greater confidence to <strong>the</strong> grade model generated.<br />

3. O<strong>the</strong>r areas where consistent <strong>mineralisation</strong> has been outlined should also be assessed<br />

for continuity <strong>and</strong> a geological model updated to include <strong>the</strong> o<strong>the</strong>r areas, such as <strong>the</strong><br />

Sembawang <strong>Vein</strong> area <strong>and</strong> <strong>the</strong> Lipan <strong>Vein</strong>. The modelling <strong>of</strong> <strong>the</strong> geology should not only<br />

outline areas <strong>of</strong> <strong>mineralisation</strong> but also quantify areas <strong>of</strong> <strong>the</strong> geological model <strong>and</strong> data<br />

set that requires fur<strong>the</strong>r input <strong>and</strong> clarification.<br />

4. A more concerted drilling effort is required in outlining areas around <strong>the</strong> main project,<br />

which have structural <strong>and</strong> alteration characteristics similar to <strong>the</strong> <strong>Mewet</strong> <strong>Vein</strong> <strong>and</strong><br />

Sembawang <strong>Vein</strong> areas, <strong>and</strong>,<br />

5. Re-categorise <strong>the</strong> exploration target to comply with <strong>the</strong> reporting st<strong>and</strong>ards as required<br />

by <strong>the</strong> 43-101 guidelines.<br />

The following specific recommendations are made:<br />

1. The drill hole spacing should be closed to 25 metre pierce points along <strong>the</strong> main <strong>Mewet</strong><br />

<strong>Vein</strong> area modelled, this includes drilling on sections 356,475N, 356,425N <strong>and</strong> 356,350N<br />

where drill holes are required below <strong>the</strong> shallow scout drill holes,<br />

2. Deep drilling on section 356,500N, below JCM-067 to test <strong>the</strong> plunging shoot to <strong>the</strong><br />

north on <strong>the</strong> vein structure <strong>and</strong> extending at <strong>the</strong> same level one section north again to<br />

356,575N below hole number JCM-074,<br />

3. Manage <strong>the</strong> core recovery position on all drilling by using larger diameter core where<br />

possible (requiring a larger drill rig), with HQ core size recommended as <strong>the</strong> recovery<br />

was good in <strong>the</strong> previous Ivanhoe drilling using this core size,<br />

4. Future drilling should include routine st<strong>and</strong>ards <strong>and</strong> blanks (5% <strong>of</strong> total samples) in <strong>the</strong><br />

dispatch stream <strong>and</strong> check analyses should be conducted at an alternate laboratory,<br />

5. A complete <strong>and</strong> comprehensive survey <strong>of</strong> drill collars is required <strong>and</strong> downhole surveys<br />

at 30 metre intervals is recommended for future drilling.<br />

13.1<br />

Future Work Programmes<br />

To advance <strong>the</strong> knowledge <strong>of</strong> <strong>the</strong> <strong>Jelai</strong> <strong>Gold</strong> <strong>Project</strong>, it will be necessary to conduct fur<strong>the</strong>r<br />

drilling in <strong>the</strong> known vein areas <strong>and</strong> regional exploration in peripheral targets. The <strong>mineralisation</strong><br />

in <strong>the</strong> project area is extensive <strong>and</strong> a number <strong>of</strong> targets are yet to be tested by drilling <strong>and</strong> a<br />

number <strong>of</strong> o<strong>the</strong>r targets have only had preliminary reconnaissance mapping completed over<br />

<strong>the</strong>m. The recommended work programme budget is shown in Table 9.<br />

Work Programme Duration Units Estimated Budget<br />

(USD)<br />

Regional geological mapping <strong>and</strong> sampling 6 months $ 75,000.00<br />

Scout drilling peripheral targets <strong>and</strong> new vein<br />

areas<br />

9 months 4,000 metres $ 500,000.00<br />

Resource drilling <strong>Mewet</strong> / Sembawang <strong>Vein</strong> 6 months 5,000 metres $ 1,000,000.00<br />

Analytical work 9 months 2,500 samples $ 70,000.00<br />

0065 JCM/GEO/2009.04 Page 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!