24.04.2014 Views

D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final

D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final

D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

e-­‐FISCAL: www.efiscal.eu <br />

EC Contract Number: 283449 <br />

Type of data Data number Data description <br />

Average values <br />

e-­‐FISCAL sample <br />

(amounts in €) <br />

Median values <br />

e-­‐FISCAL sample <br />

(amounts in €) <br />

Calculation (18)=(1)/(17) Depreciation <strong>cost</strong> <br />

56,1 43,6 <br />

logical cores <br />

Calculation <br />

(19)=(6)/(17A) <br />

Depreciation <strong>cost</strong> <br />

Tape storage 2,2 0,0 <br />

Calculation <br />

(20)=(7)/(17B) <br />

Depreciation <strong>cost</strong> Disk <br />

storage 22,0 3,8 <br />

Calculation (21)=(12)/(17) Depreciation <strong>cost</strong> <br />

8,4 4,3 <br />

interconnection <br />

Calculation (22)=(13)/(17) Depreciation <strong>cost</strong> <br />

5,2 1,9 <br />

support contract <br />

Calculation (23)=(14)/(17) Depreciation <strong>cost</strong> <br />

15,1 9,5 <br />

auxiliary equipment <br />

Calculation (24)=(18)+(19)+(20)+(21)+(22)+(23) Total CAPEX 109,1 63,0 <br />

Input (25) %Software <strong>cost</strong> over <br />

4% 2% <br />

investment <br />

Calculation (26)=(25)*(8) Software <strong>cost</strong> 16,49 3,55 <br />

Ratio (27) FTEs/1000 CPUs 4,61 2,16 <br />

Input (28) Average <strong>cost</strong> per FTE 54.207 48.800 <br />

Calculation (29)=(27)*(28)/1000 Personnel <strong>cost</strong> / core 249,8 105,5 <br />

Ratio (30) m2/'1000 core 64,96 52,41 <br />

Assumption 70 (31) Average <strong>cost</strong> per m2 100 100 <br />

Calculation (32)=(30)*(31)/1000 Site premises <strong>cost</strong> 6,496 5,241 <br />

Ratio (33) Electricity <br />

339,15 307,74 <br />

consumption per core <br />

in kWh <br />

Assumption 71 (34) Cost /kwh 0,1 0,1 <br />

Calculation (35)=(33)*(34) Electricity <strong>cost</strong> 33,915 30,774 <br />

Input (36) Connectivity <strong>cost</strong>s 0 0 <br />

Input (37) Other <strong>cost</strong>s 0 0 <br />

Calculation (38)=(26)+(29)+(32)+(35)+(36)+(37) Total OPEX 306,7 145,0 <br />

Calculation (39) = (24)+(38) Total yearly <strong>cost</strong> 415,82 208,04 <br />

Input (40) Utilisation rate 65% 75% <br />

Calculation (41) = (39)/[8760*(40)] Cost per core hour 0,0730 0,0317 <br />

Types of data: <br />

Input: Information that is reported in the same format as used in the <strong>calculations</strong> <br />

70 We have used as a reference prices indicated on http://www.globalpropertyguide.com/faq/guide-­‐sqm-­‐prices-­‐rents-­‐yields. <br />

Nevertheless, the €100/m2 per year is a rough estimation. <br />

71 http://www.energy.eu/#industrial End-­‐user energy prices for industrial consumers reference November 2011 <br />

e-­‐FISCAL : Financial Study for Sustainable <strong>Computing</strong> e-­‐<strong>Infrastructure</strong>s <br />

Deliverable <strong>D2</strong>.3 – <strong>Computing</strong> e-­‐<strong>Infrastructure</strong>s <strong>cost</strong> estimation <strong>and</strong> analysis – Pricing <strong>and</strong> <br />

Business <strong>models</strong> <br />

83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!