D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final
D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final
D2 3 Computing e-Infrastructure cost calculations and business _models_vam1-final
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
e-‐FISCAL: www.efiscal.eu <br />
EC Contract Number: 283449 <br />
e-‐FISCAL HTC average <br />
Cost break down <br />
2% <br />
0% <br />
9% <br />
21% <br />
2% <br />
Total depreciaqon <br />
So‰ware <br />
Personnel <br />
66% <br />
Premises <strong>cost</strong> <br />
Electricity <strong>cost</strong> <br />
Other <strong>cost</strong> <br />
Graph 17: e-FISCAL HTC <strong>cost</strong> break down (average)<br />
e-‐FISCAL HTC median <br />
Cost break down <br />
0% <br />
2% 14% <br />
26% <br />
Total depreciaqon <br />
1% <br />
So‰ware <br />
Personnel <br />
57% <br />
Premises <strong>cost</strong> <br />
Electricity <strong>cost</strong> <br />
Other <strong>cost</strong> <br />
Graph 18: e-FISCAL HTC <strong>cost</strong> break down (median)<br />
e-‐FISCAL : Financial Study for Sustainable <strong>Computing</strong> e-‐<strong>Infrastructure</strong>s <br />
Deliverable <strong>D2</strong>.3 – <strong>Computing</strong> e-‐<strong>Infrastructure</strong>s <strong>cost</strong> estimation <strong>and</strong> analysis – Pricing <strong>and</strong> <br />
Business <strong>models</strong> <br />
92