08.05.2014 Views

Annual Report 2005 - The Office of Public Works

Annual Report 2005 - The Office of Public Works

Annual Report 2005 - The Office of Public Works

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Hydrology and Hydrometric<br />

Hydrometric data collection<br />

At the end <strong>of</strong> <strong>2005</strong>, data was being collected at a total <strong>of</strong> 354 hydrometric gauging stations<br />

throughout the country (293 permanent and 61 project-related stations).<br />

Requests for hydrological data<br />

<strong>The</strong> Section responded to a total <strong>of</strong> 368 requests for data or information in <strong>2005</strong>, a 44%<br />

increase on 2004 and 97% were processed within 7 days <strong>of</strong> receipt. Data is also being provided<br />

via a dedicated Internet site (www.opw.ie/hydro/home.asp).<br />

Information was also provided to other agencies in connection with water body assessments<br />

related to the Water Framework Directive and the North South Share Monitoring Programme.<br />

Gauging equipment<br />

A number <strong>of</strong> sophisticated gauging equipment units were purchased and installed in<br />

connection with pilot flood warning systems for the Suir and Munster Blackwater.<br />

Structural Engineering<br />

This Unit continued to provide an advisory, design and monitoring service. In <strong>2005</strong> a<br />

considerable amount <strong>of</strong> the Unit's resources were involved with the assessment <strong>of</strong> sites for<br />

Decentralisation <strong>Office</strong>s. Prestige projects completed included new Garda Station District<br />

Headquarters in Ballina and Schengen Project in Garda HQ, Phoenix Park.<br />

<strong>The</strong> throughput <strong>of</strong> cases in the year can be summarized as follows:<br />

Project/Activity No. on hand New Projects Total Number<br />

1/1/<strong>2005</strong> In <strong>2005</strong> in <strong>2005</strong> Completed<br />

Building 13 10 23 3<br />

Civil Structural 8 5 13 0<br />

<strong>Report</strong>s 120 124 244 87<br />

Ballina District Garda Headquarters<br />

57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!