Figure 5 Mid-Atlantic Area National Corridor and Critical Congestion Area<br />

On Jan. 28, 2010, the <strong>Commission</strong> issued a Tentative Order 20 which sets forth specific Interim<br />

Guidelines to supplement the existing filing requirements, pending the conclusion of the<br />

rulemaking process. The additional information to be included in the initial filing is intended to<br />

streamline the application process by reducing the need for subsequent data requests, on a case-bycase<br />

basis, to more completely develop the record necessary to process the application. Comments<br />

to the Tentative Order were filed in March 2010.<br />

In recent transmission line siting proceedings, the <strong>Commission</strong> has given substantial weight to<br />

regional transmission studies conducted by PJM.<br />

The PJM Regional Transmission Expansion Plan (RTEP) identifies transmission system upgrades<br />

and enhancements to preserve grid reliability within the region, the foundation of competitive<br />

wholesale power markets. The RTEP five-year planning process enables PJM to assess and<br />

recommend transmission upgrades to meet forecasted near-term load growth and to ensure the safe<br />

20 Docket No. M-2009-2141293; 40 Pa.B. 953.<br />

<strong>Electric</strong> <strong>Power</strong> <strong>Outlook</strong> for <strong>Pennsylvania</strong> 2010-15 9