Electric Power Outlook - Pennsylvania Public Utility Commission
Electric Power Outlook - Pennsylvania Public Utility Commission
Electric Power Outlook - Pennsylvania Public Utility Commission
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Status of <strong>Pennsylvania</strong>'s Plant Additions and Upgrades<br />
Transmission<br />
Queue PJM Substation MW MWC Status In Service Fuel Owner<br />
G06 Martins Creek #4 850 30 Under Construction 2012 Q1 Coal PPL<br />
G51_W60 Hatfield Ferry 500 kV 525 525 Under Construction 2013 Q1 Coal APS<br />
K02 East Towanda-Moshannon 230kV 70 0 Suspended 2012 Q2 Wind PENELEC<br />
M12 Susquehanna #2 2520 107 Partially In-Service 2011 Q3 Nuclear PPL<br />
M26 Champion 272 272 Suspended 2013 Q4 Coal APS<br />
N32 Gans 138kV 50 10.1 Under Construction 2011 Q4 Wind APS<br />
N36 Gold-Sabinsville 115kV 50 10 Suspended 2011 Q2 Wind PENELEC<br />
O19 Somerset 115kV 33 6.6 Suspended 2013 Q2 Wind PENELEC<br />
O52 Gold-Potter Co 115kV 50 10 Suspended 2011 Q2 Wind PENELEC<br />
O56 Osterburg East 115kV 76 15.2 Suspended 2013 Q1 Wind PENELEC<br />
O60 Berlin 23 kV 5 1.08 Suspended 2012 Q1 Wind PENELEC<br />
O72 Hooversville-Central City 60 12 Under Construction 2012 Q4 Wind PENELEC<br />
P01 Westover-Madera 115kV 65 13 Suspended 2011 Q4 Wind PENELEC<br />
P04 Peach Bottom 500kV 557 550 In-Service 2011 Q1 Natural Gas PECO<br />
P28 Mehoopany 115kV 150 30 Suspended 2012 Q2 Wind PENELEC<br />
Q25 Donegal-Iron City 138kV 80 16 Suspended 2014 Q1 Wind APS<br />
Q28 Eldred-Frackville 230kV 170 34 Suspended 2011 Q3 Wind PPL<br />
Q34 Garrett 115kV 100 20 Suspended 2011 Q2 Wind PENELEC<br />
Q36 Philipsburg - Tyrone North 115kV 50 10 Suspended 2011 Q1 Wind PENELEC<br />
Q47 Peach Bottom 2532 140 Under Construction 2013 Q2 Nuclear PECO<br />
Q53 Summit-West Fall 115kV 38 7.6 In-Service 2011 Q2 Wind PENELEC<br />
R01 Susquehanna 800 800 Active 2018 Q4 Nuclear PPL<br />
R02 Susquehanna 800 800 Active 2018 Q4 Nuclear PPL<br />
R32 Salix - Claysburg 115kV 75 15 Under Construction 2011 Q4 Wind PENELEC<br />
R43 Frackville - Hauto #3 20 4 Suspended 2012 Q2 Wind PPL<br />
S103 Warren 115kV 57 57 In-Service 2011 Q2 Natural Gas PENELEC<br />
S29B Somerset 23kV 7 5.7 Under Construction 2011 Q1 Methane PENELEC<br />
S42 Eldred-Fairview 18 3.6 Under Construction 2012 Q1 Wind PPL<br />
S64 York Inc. 115kV 18 18 Active 2011 Q1 Biomass ME<br />
T117 Hunlock Creek 69kV 126 126 Under Construction 2012 Q2 Natural Gas UGI<br />
T156 Champion 292 20 Active 2011 Q1 Coal APS<br />
T174 Yukon-Browns Run 500kV 930 900 Active 2011 Q2 Natural Gas APS<br />
U1-010 Peach Bottom 575 18 In-Service 2011 Q1 Natural Gas PECO<br />
U1-051 Clearfield 130 16.9 Active 2011 Q4 Wind PENELEC<br />
U1-068 York 115kV 51 10 In-Service 2011 Q1 Natural Gas ME<br />
U2-016 Grover 230kV 85 11.05 Active 2011 Q4 Wind PENELEC<br />
U2-029 Passyunk 1 0 Active 2015 Q4 Solar PECO<br />
U2-054 Weissport 3 2.6 Under Construction 2014 Q2 Hydro PPL<br />
U2-055 Karthaus-Milesburg 230kV 89 11.5 Active 2012 Q3 Wind APS<br />
U2-074 Peach Bottom-Rock Springs 500kV 650 650 Active 2012 Q4 Natural Gas PECO<br />
U2-076 Falls 10 10 Suspended 2011 Q1 Methane PECO<br />
U3-029 Beaver Valley #1 950 37 Under Construction 2013 Q4 Nuclear DL<br />
U3-030 Beaver Valley #2 951 38 Under Construction 2012 Q4 Nuclear DL<br />
U4-014 Siegfried-Hauto 69kV 10 3.8 Under Construction 2011 Q4 Solar PPL<br />
V1-027 Limerick 1213 20 Partially In-Service 2011 Q2 Nuclear PECO<br />
68<br />
<strong>Pennsylvania</strong> <strong>Public</strong> <strong>Utility</strong> <strong>Commission</strong>