04.06.2014 Views

Electric Power Outlook - Pennsylvania Public Utility Commission

Electric Power Outlook - Pennsylvania Public Utility Commission

Electric Power Outlook - Pennsylvania Public Utility Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Status of <strong>Pennsylvania</strong>'s Plant Additions and Upgrades<br />

Transmission<br />

Queue PJM Substation MW MWC Status In Service Fuel Owner<br />

G06 Martins Creek #4 850 30 Under Construction 2012 Q1 Coal PPL<br />

G51_W60 Hatfield Ferry 500 kV 525 525 Under Construction 2013 Q1 Coal APS<br />

K02 East Towanda-Moshannon 230kV 70 0 Suspended 2012 Q2 Wind PENELEC<br />

M12 Susquehanna #2 2520 107 Partially In-Service 2011 Q3 Nuclear PPL<br />

M26 Champion 272 272 Suspended 2013 Q4 Coal APS<br />

N32 Gans 138kV 50 10.1 Under Construction 2011 Q4 Wind APS<br />

N36 Gold-Sabinsville 115kV 50 10 Suspended 2011 Q2 Wind PENELEC<br />

O19 Somerset 115kV 33 6.6 Suspended 2013 Q2 Wind PENELEC<br />

O52 Gold-Potter Co 115kV 50 10 Suspended 2011 Q2 Wind PENELEC<br />

O56 Osterburg East 115kV 76 15.2 Suspended 2013 Q1 Wind PENELEC<br />

O60 Berlin 23 kV 5 1.08 Suspended 2012 Q1 Wind PENELEC<br />

O72 Hooversville-Central City 60 12 Under Construction 2012 Q4 Wind PENELEC<br />

P01 Westover-Madera 115kV 65 13 Suspended 2011 Q4 Wind PENELEC<br />

P04 Peach Bottom 500kV 557 550 In-Service 2011 Q1 Natural Gas PECO<br />

P28 Mehoopany 115kV 150 30 Suspended 2012 Q2 Wind PENELEC<br />

Q25 Donegal-Iron City 138kV 80 16 Suspended 2014 Q1 Wind APS<br />

Q28 Eldred-Frackville 230kV 170 34 Suspended 2011 Q3 Wind PPL<br />

Q34 Garrett 115kV 100 20 Suspended 2011 Q2 Wind PENELEC<br />

Q36 Philipsburg - Tyrone North 115kV 50 10 Suspended 2011 Q1 Wind PENELEC<br />

Q47 Peach Bottom 2532 140 Under Construction 2013 Q2 Nuclear PECO<br />

Q53 Summit-West Fall 115kV 38 7.6 In-Service 2011 Q2 Wind PENELEC<br />

R01 Susquehanna 800 800 Active 2018 Q4 Nuclear PPL<br />

R02 Susquehanna 800 800 Active 2018 Q4 Nuclear PPL<br />

R32 Salix - Claysburg 115kV 75 15 Under Construction 2011 Q4 Wind PENELEC<br />

R43 Frackville - Hauto #3 20 4 Suspended 2012 Q2 Wind PPL<br />

S103 Warren 115kV 57 57 In-Service 2011 Q2 Natural Gas PENELEC<br />

S29B Somerset 23kV 7 5.7 Under Construction 2011 Q1 Methane PENELEC<br />

S42 Eldred-Fairview 18 3.6 Under Construction 2012 Q1 Wind PPL<br />

S64 York Inc. 115kV 18 18 Active 2011 Q1 Biomass ME<br />

T117 Hunlock Creek 69kV 126 126 Under Construction 2012 Q2 Natural Gas UGI<br />

T156 Champion 292 20 Active 2011 Q1 Coal APS<br />

T174 Yukon-Browns Run 500kV 930 900 Active 2011 Q2 Natural Gas APS<br />

U1-010 Peach Bottom 575 18 In-Service 2011 Q1 Natural Gas PECO<br />

U1-051 Clearfield 130 16.9 Active 2011 Q4 Wind PENELEC<br />

U1-068 York 115kV 51 10 In-Service 2011 Q1 Natural Gas ME<br />

U2-016 Grover 230kV 85 11.05 Active 2011 Q4 Wind PENELEC<br />

U2-029 Passyunk 1 0 Active 2015 Q4 Solar PECO<br />

U2-054 Weissport 3 2.6 Under Construction 2014 Q2 Hydro PPL<br />

U2-055 Karthaus-Milesburg 230kV 89 11.5 Active 2012 Q3 Wind APS<br />

U2-074 Peach Bottom-Rock Springs 500kV 650 650 Active 2012 Q4 Natural Gas PECO<br />

U2-076 Falls 10 10 Suspended 2011 Q1 Methane PECO<br />

U3-029 Beaver Valley #1 950 37 Under Construction 2013 Q4 Nuclear DL<br />

U3-030 Beaver Valley #2 951 38 Under Construction 2012 Q4 Nuclear DL<br />

U4-014 Siegfried-Hauto 69kV 10 3.8 Under Construction 2011 Q4 Solar PPL<br />

V1-027 Limerick 1213 20 Partially In-Service 2011 Q2 Nuclear PECO<br />

68<br />

<strong>Pennsylvania</strong> <strong>Public</strong> <strong>Utility</strong> <strong>Commission</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!