18.06.2014 Views

IWMP-1 - Commissionerate of Rural Development Gujarat State

IWMP-1 - Commissionerate of Rural Development Gujarat State

IWMP-1 - Commissionerate of Rural Development Gujarat State

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

in the following manner. The WDT equipped with a GPS instrument marks the latitude-longitude information <strong>of</strong> various treatment areas during<br />

the DPR. The probable sites are then transferred onto the central server. During the works phase, any progress in the treatment areas is<br />

reported to the server by means <strong>of</strong> an SMS by the WDT. Similarly, any nodal <strong>of</strong>ficer or higher-up <strong>of</strong>ficial can view the progress in a project by<br />

means <strong>of</strong> summarized reports generated over frequent periods <strong>of</strong> time.<br />

7.2 Plans for Project management:<br />

The Project management <strong>of</strong> any watershed programme is very important. It mainly depends upon the community organisation and the<br />

village level institutes. In Sankoi project, watershed committee, various user groups and SHGs have been formulated for post project operation<br />

and maintenance <strong>of</strong> assets created during project period. Major emphasis will be on equity and sustainable benefit <strong>of</strong> the project even after<br />

implementation stage. A proper link-up will be built during project period with various institutes and capacity building organisation. They will<br />

act as a major kingpin during post implementation for scaling up the successful experience during project.<br />

7.3 Watershed <strong>Development</strong> Fund:<br />

The major source <strong>of</strong> financial assistance after post implementation period is watershed <strong>Development</strong> Fund. The contribution <strong>of</strong> it will<br />

comes mainly fund the following:<br />

7.4 User Charges:<br />

Various user groups will be formed in village. These user groups will collect user charges according to the designated rules formed<br />

during the formation <strong>of</strong> user group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary <strong>of</strong> watershed<br />

committee (WC) shall maintain the records <strong>of</strong> the following.<br />

West Forest Division- Rajpipla Page 123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!