- Page 1 and 2:
11 2010- Detail Project Report SANK
- Page 3 and 4:
Chapter 3 Basic Information of the
- Page 5 and 6:
Chapter 4 Watershed Activities 4.1.
- Page 7 and 8:
Chapter 5 Budgeting Table no. 47: V
- Page 9 and 10:
CHAPTER-1 PROJECT BACKGROUND 1.1 Pr
- Page 11 and 12:
1.2 Need of watershed development p
- Page 13 and 14:
xi xii xiii Contiguity to another w
- Page 15 and 16:
Table no.4: Developmental programme
- Page 17 and 18:
CHAPTER-2 PROJECT IMPLEMENTING AGEN
- Page 19 and 20:
Table no. 6: PIA: Sr. No. Names of
- Page 21 and 22:
Table no. 8: Land use pattern: Sr.
- Page 23 and 24:
Table no. 10: Flood and drought con
- Page 25 and 26:
Table no. 12: Climatic conditions:
- Page 27 and 28:
Table no. 15: Agriculture Sr. No. V
- Page 29 and 30:
Figure-3: Biophysical survey of the
- Page 31 and 32:
3.1.5 Drinking water: Sources of dr
- Page 33 and 34:
3.2. Socio-Economic Profile 3.2.1 D
- Page 35 and 36:
Table no. 23: Migration details Mig
- Page 37 and 38:
Table no. 26 : Facilities / HH asse
- Page 39 and 40:
3.3. Livelihood pattern: The villag
- Page 41 and 42:
In Sankoi project people grow crops
- Page 43 and 44:
3 Soil fertility very low: In Sanko
- Page 45 and 46:
Bio-physical survey was undertaken
- Page 47 and 48:
8. Activity yes Crop simulation mod
- Page 49 and 50:
1 Vasava Narapatbhai Bhisubhai Pres
- Page 51 and 52:
1 Vasava Ishwarbhai Kalidas Preside
- Page 53 and 54:
Table no. 32: SHG detail Sr. No. Na
- Page 55 and 56:
Figure 7 Focused Group Discussions
- Page 57 and 58:
5 Galiba 10 1 11 (i)Landless (iv) L
- Page 59 and 60:
West Forest Division- Rajpipla Page
- Page 61 and 62:
* Long vertical wall O/o 2 5.30 0.7
- Page 63 and 64:
2. Contour trench These trenches ac
- Page 65 and 66:
Vanderveli Pond 1 8.50 12500 2 9 12
- Page 67 and 68:
Table no. 39: Other activities of w
- Page 69 and 70:
3 Vanderveli 4 Valpor 5 Galiba Gull
- Page 71 and 72:
9 Varkhadi Gully Plug L P WC 24 3.0
- Page 73 and 74:
Table no. 40.3 Estimation of Farm B
- Page 75 and 76:
cement plastering in cm 1:3 ( 20mm
- Page 77 and 78:
C.C 1:3:6 Key wall up to G.L.......
- Page 79 and 80: Table no. 40.6 Estimation of New po
- Page 81 and 82: 4 Valpor 5 Galiba 6 Fichwada Nurser
- Page 83 and 84: Estimation of Fruit tree plantation
- Page 85 and 86: Sr. No. Name of village Name of act
- Page 87 and 88: Sr. No. Name of village 4 Valpor Ty
- Page 89 and 90: Sr. No. Name of village 6 Fichwada
- Page 91 and 92: Sr. No. Name of village 8 Sankoi Ty
- Page 93 and 94: Estimation of Vermi compost unit No
- Page 95 and 96: Estimation of Utensil services Sr.
- Page 97 and 98: 5 Fichwada Gouchar Fodder Developme
- Page 99 and 100: Table no. 45: Capacity Building pla
- Page 101 and 102: CHAPTER-5 BUDGETING The first step
- Page 103 and 104: Table no.50: Details of Convergence
- Page 105 and 106: 6 Fichwada 7 Rupghat 8 Sankoi MGNRE
- Page 107 and 108: CHAPTER-6 EXPECTED OUTCOME 6.1 Expe
- Page 109 and 110: 6.1.3 Ground water table Due to the
- Page 111 and 112: Vanderveli Valpor Galiba Fichwada K
- Page 113 and 114: Table no. 56: Area under horticultu
- Page 115 and 116: Milch-animals Cow (per animal/day)
- Page 117 and 118: Milch-animals Cow (per animal/day)
- Page 119 and 120: Logical Framework Analysis Componen
- Page 121 and 122: Promotion of better Irrigation prac
- Page 123 and 124: in the following manner. The WDT eq
- Page 125 and 126: Figure-8.2: Land use map West Fores
- Page 127 and 128: Figure-8.4: Slope map West Forest D
- Page 129: Figure-8.6: Geomorphology map West
- Page 133 and 134: West Forest Division- Rajpipla Page
- Page 135 and 136: West Forest Division- Rajpipla Page
- Page 137 and 138: West Forest Division- Rajpipla Page