18.06.2014 Views

IWMP-1 - Commissionerate of Rural Development Gujarat State

IWMP-1 - Commissionerate of Rural Development Gujarat State

IWMP-1 - Commissionerate of Rural Development Gujarat State

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table no.35: Details <strong>of</strong> activities <strong>of</strong> preparatory phase (All financial figures in lakh Rs.)<br />

Sr. No.<br />

Name <strong>of</strong><br />

villages<br />

Initiation <strong>of</strong><br />

village level<br />

institution<br />

(lakh)<br />

Capacity<br />

building<br />

(lakh)<br />

IEC<br />

activities<br />

(lakh)<br />

Baseline<br />

survey<br />

(lakh)<br />

Hydrogeological<br />

survey<br />

(lakh)<br />

Any other<br />

(please<br />

specify)<br />

(lakh)<br />

Estimated Cost<br />

(Rs. in lakh)<br />

1 Kharetha 0.73 2.23 1.02 0.22 0.07 0.092 4.36<br />

2 Kund 0.18 0.56 0.26 0.06 0.02 0.023 1.10<br />

3 Vandarveli 0.53 1.62 0.74 0.16 0.05 0.067 3.17<br />

4 Valpor 0.38 1.15 0.53 0.11 0.04 0.047 2.26<br />

5 Galiba 1.21 3.72 1.70 0.36 0.12 0.152 7.26<br />

6 Fichvada 0.59 1.81 0.83 0.18 0.06 0.074 3.54<br />

7 Rupghat 0.56 1.70 0.78 0.17 0.06 0.070 3.34<br />

8 Sankoi 1.32 4.04 1.85 0.40 0.13 0.166 7.91<br />

9 Varkhadi 0.48 1.48 0.67 0.14 0.05 0.060 2.88<br />

Table no.36: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.)<br />

Village<br />

name<br />

Kharetha<br />

Kund<br />

Proposed target<br />

Augmentation/ repair <strong>of</strong> existing<br />

structures Construction <strong>of</strong> new structures Total target<br />

Area to<br />

Area to<br />

Area to<br />

Est.<br />

be Storage Estimated<br />

be<br />

be<br />

Cost<br />

irrigated capacity cost<br />

irrigated Storage<br />

irrigated Storage<br />

No. (ha) (lit.) (lakh)<br />

(lakh)<br />

No. (ha) capacity<br />

(ha) cap.(lit)<br />

Type <strong>of</strong> structures<br />

Pond 1 7.65 11250 1.8 8 11250 1.8<br />

Check dam 2 12 22000 4 6 35.29 66667 12.0 47 88889 16<br />

Percolation tank 2 2.50 5000 1.0 3 5000 1<br />

TOTAL 2 12 22000 4 8 37.79 71667 13 50 93889 18.8<br />

Pond 1 6.38 9375 1.5 6 9375 1.5<br />

Check dam 1 4.41 8333 1.5 4 8333 1.5<br />

Percolation tank 2 2.50 5000 1.0 3 5000 1<br />

TOTAL 0 0 0 0 4 13.29 22708 4 13.29 22708 4<br />

Est.<br />

Cost<br />

(lakh)<br />

West Forest Division- Rajpipla Page 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!