19.06.2014 Views

SACOG Conformity Determination

SACOG Conformity Determination

SACOG Conformity Determination

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE 7<br />

CONNECTOR PROJECTS<br />

PLACER PARKWAY<br />

• Placer Parkway – Study a new transportation facility between Route 65 to Route 99; $4,700,000; 2005<br />

(PLA20720)<br />

• Placer Parkway Phase 1 – In Placer County, construct new two-lane roadway between Route 65 and Route 99;<br />

$370,000,000; 2027 (PLA20721). This project includes Route 99, new interchange Sutter County, north of<br />

Sacramento; along Route 99 between Riego Road and Sankey Road, construct new interchange. The Placer<br />

County portion of the entire project is $238,000,000; the Sutter County portion is $132,000,000.<br />

• Placer Parkway – Protect open space to north and south of Placer Parkway, in western Placer County;<br />

$30,000,000; 2016 (PLA20723)*<br />

Total: $404,700,000<br />

RANCHO CORDOVA – SOUTH PLACER CONNECTION<br />

• I-80 – Widen existing Sierra College Boulevard Interchange from two to four lanes, including the on- and offramps<br />

and loops; $28,548,000; 2007 (PLA19490)<br />

• Sierra College Boulevard – In Rockin, Sierra College Boulevard from El Don to Nightwatch; widen from two to<br />

four lanes; $950,000; 2010 (PLA20460)<br />

• Sierra College Boulevard – Widen Sierra College Boulevard from two to four lanes from I-80 interchange to<br />

Rocklin Road; $1,800,000; 2007 (PLA20470)<br />

• Sierra College Boulevard –Widen Sierra College Boulevard from four to six lanes from Aguilar Tributary-<br />

Nightwatch; $2,170,000; 2008 (PLA20500)<br />

• Eureka Boulevard – Widen from two to four lanes, from Sierra College to city limits; $500,000; 2012<br />

(PLA15720)<br />

• Roseville Parkway – Extend Roseville Parkway over Union Pacific Railroad tracks; $4,900,000; 2010<br />

(PLA20970)<br />

• Sierra College Boulevard – Widen Sierra College Boulevard from Olympus Drive to north city limits from two to<br />

four lanes; $3,700,000; 2006 (PLA20250).<br />

• Sunrise Avenue – Widen from four to six lanes from Sacramento County line to Madden lane; $5,000,000; 2015<br />

(PLA15890)<br />

• Sierra College Boulevard – South Rocklin city limits to Douglas; widen road from two to four lanes; $3,700,000;<br />

2006 (PLA15600)<br />

• Sierra College Boulevard – Widen from four to six lanes from N. of Douglas to Sacramento County line;<br />

$5,000,000; 2020 (PLA20710)<br />

• Sierra College Boulevard – Widen to six lanes from the Interstate to Aguilar Tributary; $2,000,000; 2007<br />

(PLA15400)<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!