<strong>Annual</strong> <strong>Monitoring</strong> <strong>Report</strong> <strong>2007</strong><br />
4 Local Development Framework -<br />
Indicators<br />
28<br />
Unidentified sites within settlements (estimate derived from the Urban Capacity Study) (iv)<br />
4.37 Projected Completions on sites with planning permission - 1113 dwellings have permission<br />
as of 1st April <strong>2007</strong>. To estimate the actual number of dwellings that will come forward a discount<br />
is applied. For information on how this is calculated please refer to Appendix B.<br />
Greenfield<br />
Brownfield<br />
Total<br />
Available April <strong>2007</strong><br />
224<br />
889<br />
1113<br />
Table 4.12 Dwellings with Planning Permission<br />
Discounted<br />
4.38 It is anticipated that these dwellings with existing permission will be completed over the<br />
next 3/4 years and an estimation of projected completions are shown below. It should be noted<br />
that the expiry period for planning permissions has been reduced to 3 years, however, at present<br />
a small number of permissions remain with 5 year periods of validity. The breakdown of figures<br />
in the table below is an estimate of when dwellings with planning permission will reach<br />
completion.<br />
114<br />
754<br />
868<br />
Year<br />
Brownfield<br />
Greenfield<br />
Total<br />
<strong>2007</strong>/08<br />
300<br />
50<br />
350<br />
2008/09<br />
275<br />
25<br />
300<br />
2009/10<br />
130<br />
20<br />
150<br />
2010/11<br />
49<br />
19<br />
68<br />
2011/12<br />
0<br />
0<br />
0<br />
Total<br />
754<br />
114<br />
868<br />
Table 4.13 Profile of Development of Dwellings with Planning Permission <strong>2007</strong>/08 - 2011/12<br />
iv<br />
Whilst PPS3 states that windfall development should not be included unless exceptional<br />
circumstances warrant otherwise, it is considered that the inclusion of part of the findings<br />
of the UPS is justified until such time that the upcoming Housing Land Availability<br />
Assessment (HLAA) is completed. The figures predicted included under this heading are<br />
derived only from those those sites identified through a complete survey of pre-determined<br />
areas. These areas were <strong>Scarborough</strong> Town Centre, Falsgrave, Ramshill, Whitby Town<br />
Centre, Filey Town Centre and Hunmanby. The actual predictions for completions in these<br />
areas has been justified by monitoring of actual completions in these areas.