31.08.2014 Views

Whole report - STUK

Whole report - STUK

Whole report - STUK

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>STUK</strong>-YTO-TR 175<br />

3.3 The second measurement<br />

campaign<br />

All measurements were performed with the fork<br />

prongs attached. Like in the first campaign, the<br />

horizontal coordinate x = 0 mm was used in all<br />

measurements<br />

The total neutron count, the gross gamma<br />

current and the gamma spectrum of assemblies<br />

no. 17–27 listed in Table I were measured at three<br />

different heights, at z = 5135, 5705 and 6275. Like<br />

in the September campaign, the assemblies were<br />

measured at four sides with 90 degrees rotation.<br />

The assembly #12323, which had been measured<br />

in September, was remeasured to scale the measurement<br />

data of this campaign with the September<br />

campaign.<br />

The fuel assembly #12323 was scanned axially<br />

at eleven vertical positions (Table III).<br />

Table III. Coordinates of the axial scanning.<br />

x (mm)<br />

z (mm)<br />

0 4375<br />

0 4755<br />

0 5135<br />

0 5515<br />

0 5705<br />

0 5895<br />

0 6275<br />

0 6655<br />

0 7035<br />

0 7415<br />

0 7795<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!