ATLAS # 43734 - Terra Santa School<br />

Construction <strong>of</strong> Multi-Purpose Hall and finishing works at the Basement in the Terra Santa Kindergarten<br />

Item# Description Unit Qty. Rate Amount<br />

(<strong>Bill</strong> - 11 ) ELECTRICAL WORKS<br />

11 a) Preamble:<br />

All electrical works shall be according to general and particular<br />

specifications, drawings, engineer’s approval, complete ready for<br />

work in place and in operable manner including chipping in walls,<br />

excavation, backfilling , cutting, fixing, cables ,conduits ,pipes ,<br />

testing and handling over to JERUSALEM Electric Authority. The<br />

contractor should hold any test required according to supervisor<br />

engineers approval.<br />

11.01 Supply, install, fix, connect , commission ,label and test the<br />

following final distribution panel boards (Metal) including LV<br />

section, Legrand or equally approved circuit breakers, pipes and<br />

all components, ready for work according to drawings,<br />

specifications and engineer’s approval.<br />

11.01.1 DB-HALL No 1<br />

11.01.2 DB-KVAR (80KVA) complete ready for work. No 1<br />

11.02 Supply, install, connecting, commission and testing the following<br />

items including conduits, conduit accessories, boxes, wires,<br />

switches, cables, socket outlet devices and all what is necessary<br />

according to drawings, specifications and engineer’s approval. ,<br />

Legrand or equally approved.<br />

11.02.1 Light point. No 175<br />

11.02.2 6A 3 pins with automatic shutter socket outlet. No 3<br />

11.02.3 16A 3 pins with automatic shutter power socket outlet fot th e No 2<br />

Split unit use, with double pole switch and sign lamp.<br />

11.02.4 6A 3 pins (WP) Twin socket outlet with automatic shutter. No 3<br />

11.02.5 16A 3 pins with automatic shutter Twin socket outlet No 18<br />

11.02.6 Ditto as item (e)but Modular flush mounted floor service outlet No 3<br />

box in the stage<br />

11.02.7 Hand Dryer point. No 2<br />

11.02.8 Double pole switch with indicating lamp. No 2<br />

11.02.9 Photocell activated Hand Dryer (2000W)-Venta. No 2<br />

11.02.10 Extract fan point. No 4<br />

11.03 Supply, install, connect ,commission and testing the following<br />

lighting fixtures including tubes, starters, capacitors, ballasts,<br />

bulbs, and all what is necessary according to drawings,<br />

specifications and engineer’s approval .GAASH or equally<br />

approved.<br />

11.03.1 4x18W fluorescent lighting fixture with double parabolic reflector- No 86<br />

false ceiling mounted.<br />

11.03.2 2x18W-PL (W.P) fixture with opal cover ceiling mounted. No 17<br />

11.03.3 2x8 W 3 hours duration non – maintained emergency lighting<br />

fixture.<br />

No 15<br />

11.03.4 As above but EXIT light. No 5<br />

11.03.5 Spot lights – Halogen (50W).in falser ceiling. No 20<br />

11.03.6 Wall mounted (60W globe) - WP. No 5<br />

11.03.7 Projection lights-100W on metal support complete. No 9<br />

11.03.8 Hexagonal lantern-60W wall mounted. No 6<br />

11.03.9 1*36W) Fluorescent lighting fixture with U reflector. No 6<br />

Consultant: Diyar Consultants Co. Engeering Unit @ <strong>UNDP</strong>/PAPP 15/31