ATLAS # 43734 - Terra Santa School<br />
Construction <strong>of</strong> Multi-Purpose Hall and finishing works at the Basement in the Terra Santa Kindergarten<br />
Item# Description Unit Qty. Rate Amount<br />
PART 1: Terra Santa (Mutli-Purpose Hall) BOQ<br />
(<strong>Bill</strong> - 01) EXCAVATION AND BACKFILLING<br />
Preamble:<br />
Excavations <strong>of</strong> all sites including external works cut and or fill in<br />
any kind <strong>of</strong> soil to required level approved by the engineer<br />
(reduced level) excavation and cut to the reduced level including<br />
scraping <strong>of</strong> the top soil and removal <strong>of</strong> trees and extra unsuitable<br />
soil. Price shall include any filling and backfilling with excavated<br />
suitable soil or and imported fill where required that shall be<br />
applied on layers 200 mm thick and compacted up to 95%<br />
according to modified AASHTO Density T–80. Excavation for<br />
foundations must be horizontal and straight at all directions and<br />
to the proper layer. If the excavation is not level, the price shall<br />
includefor casting plain concrete(B150) to straighten out any<br />
difference in leveling.<br />
1.01 Excavation to reduce levels. MC 200<br />
1.02 Structural excavation for all foundations including external<br />
foundations and tie beams.<br />
MC 1060<br />
1.03 2.00 m thick base course layer below foundations compacted in<br />
layers <strong>of</strong> 30cm maximum to achieve 100% compaction in<br />
accordance with modified AASHTO Density T–80.<br />
MC 1000<br />
TOTAL CARRIED TO SUMMARY<br />
Consultant: Diyar Consultants Co. Engeering Unit @ <strong>UNDP</strong>/PAPP 1/31