Removal of Existing Structures and Other Obstructions<br />

y<br />

This work shall include, but not be limited to, the removal of existing structures and<br />

other obstructions interfering with the Works. The salvaging of any of these<br />

materials for the use for the Engineer shall be as directed by the Engineer and<br />

unwanted materials shall be disposed off the Site in a satisfactory manner.<br />

Cleaning and Grubbing<br />

The Contractor shall perform the clearing and grubbing (if any), of top soil consisting<br />

mainly of loose soil, vegetable and organic matters, drift sand, unsuitable soil and<br />

rubbish by scarifying the areas to be excavated and sidewalks to a minimum depth of<br />

300mm from the natural ground level. All materials resulting from the above<br />

operations shall be removed from the site, loaded and transported and off loaded,<br />

spread and leveled to approved dumps.<br />

20.4.1.5 Setting-Out<br />

The Contractor shall stake-out the work as shown on the Drawings and secure the<br />

Engineer's approval of his stake-out before proceeding with construction. If, in the<br />

opinion of the Engineer, modification of the line or grade is advisable before or after<br />

stake-out, the Engineer will issue detailed instructions in writing to the Contractor for<br />

such modification and the Contractor shall revise the stake-out for further approval in<br />

accordance with the relevant Clause of the Conditions of Contract.<br />

20.4.1.6 Excavation<br />

The Contractor shall perform all excavation true to line, width and depths shown on<br />

the Drawings or to such further lines, depths or dimensions or to reach suitable<br />

bearing strata as may be directed by the Engineer.<br />

Keeping Excavations Free from Water<br />

All excavations shall be kept clear of water by pumping or bailing or by wellpoint<br />

dewatering, but the latter system shall not be employed if any danger exists of<br />

withdrawing water from the foundations of the adjoining buildings and such water<br />

shall be discharged clear of the Works and the method adopted shall in no way<br />

contravene with regulations of the Municipalities.<br />

The system or systems to be employed shall be approved by the Engineer. Such<br />

approval if given, shall not waive the Contractor's responsibilities and liabilities<br />

under the Contract.<br />

Particular attention shall be paid to the installation of sheeting and shoring as may be<br />

necessary for the protection of the work and for the safety of personnel and public.<br />

Storing of Suitable Excavated Material<br />

301