y<br />

- Offsets from permanent references such as road edge, road centerline, kerb<br />

line, building line etc. at suitable Intervals as directed by the Engineer,<br />

for all services.<br />

- Level profiles for all sewerage, drainage, rising mains and pipelines.<br />

Also the contractor shall submit geometric and construction data for the<br />

Engineers review and approval. On approval from the Engineer, the<br />

contractor shall submit 6-copies of such records along with the "As-built"<br />

drawings.<br />

No final payment shall be made except for work that has been completed in<br />

accordance with the Specification and has been duly presented on the "As-<br />

Built" Drawings.<br />

The Contractor shall not be entitled to any direct payment or extension of<br />

time for the preparation of the above mentioned drawings.<br />

Eight) The Contractor shall at the commencement of works, provide the<br />

Engineer's Representative for his full and exclusive use enough number of<br />

concrete, asphalt, and room thermometers as required by the Engineer.<br />

1.46.5 Payment<br />

No direct payment will be made for assistance to the Engineer. All costs shall<br />

be considered included in the Contract bid items.<br />

1.47 Surveying Equipment<br />

1.47.1 Schedule of Equipment<br />

The equipment required on site under this contract shall be to the Engineer's<br />

approval and is as follows:<br />

Item Description No.<br />

a. Rolling Straight Edge when required 1<br />

b. Electronic total station (TC 1600 or<br />

equivalent with data recording facilities) 1<br />

c. Target reflectors with 2 km range 3<br />

d. Automatic level, tripod and staff<br />

(NAK 2 or equivalent) 1<br />

e. 2m ranging poles 10<br />

f. 30 meter steel tape 2<br />

g. 30 meter fiber tape 2<br />

h. Manhole lifting keys for: heavy duty covers 6<br />

medium duty cover 6<br />

light duty cover 6<br />

i. Weatherproof, rubber-cased torches 6<br />