10.11.2014 Views

NAVAL AVIATION SYSTEMS - NASA Wiki

NAVAL AVIATION SYSTEMS - NASA Wiki

NAVAL AVIATION SYSTEMS - NASA Wiki

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D&F<br />

DFAR<br />

DID<br />

DMR<br />

DOP<br />

DOT&E<br />

DPRO<br />

DRB<br />

DRPM<br />

DRRB<br />

DSMC<br />

DSSP<br />

DT&E<br />

ECP<br />

EDT<br />

EMD<br />

EMI<br />

EPA<br />

ET<br />

ETS<br />

FAR<br />

FMS<br />

FOT&E<br />

FPI<br />

FSED<br />

FYDP<br />

GFE<br />

GSE<br />

HAZMAT<br />

HCA<br />

HM<br />

HMC&M<br />

HSI<br />

IBR<br />

IDP<br />

ILS<br />

ILSMT<br />

ILSTIP<br />

IMIP<br />

IOC<br />

IPR<br />

IPS<br />

IPT<br />

J&A<br />

JRMB<br />

JROC<br />

LM<br />

LOGPARS<br />

LOR<br />

LORA<br />

LRFP<br />

LRG<br />

LRIP<br />

Determination and Findings<br />

Defense Federal Acquisition Regulations<br />

Data Item Description<br />

Defense Management Report<br />

Development Options Paper<br />

Director, Operational Test and Evaluation<br />

Defense Plant Representative Office<br />

Defense Resources Board<br />

Direct Reporting Program Manager<br />

Data Requirements Review Board<br />

Defense Systems Management College<br />

Defense Standardization and Specification Program<br />

Development Test & Evaluation<br />

Engineering Change Proposal<br />

Externally Directed Teams<br />

Engineering and Manufacturing Development (also E&MD)<br />

Electromagnetic Interference<br />

Extended Planning Annex<br />

Enterprise Team<br />

Engineering and Technical Services<br />

Federal Acquisition Regulations<br />

Foreign Military Sales<br />

Follow On Test and Evaluation<br />

Fixed Price Incentive<br />

Full Scale Engineering Development (also FSD - Full Scale<br />

Development)<br />

Future Year Defense Plan<br />

Government Furnished Equipment<br />

Ground Support Equipment<br />

Hazardous Material<br />

Head of Contracting Activity<br />

Hazardous Material<br />

Hazardous Material Control and Management<br />

Human-System Integration<br />

Integrated Baseline Review<br />

Individual Development Plan<br />

Integrated Logistics Support<br />

Integrated Logistics Support Management Team<br />

Integrated Logistics Support Technical Improvement Program<br />

Industrial Modernization Incentives Program<br />

Initial Operating Capability<br />

Interdepartmental Purchase Request<br />

Integrated Program Summary<br />

Integrated Program Team<br />

Justification & Approval<br />

Joint Requirement & Management Board<br />

Joint Requirements Oversight Council<br />

Logistics Manager<br />

Logistics Planning and Requirements Simplification<br />

Level of Repair<br />

Level of Repair Analysis<br />

Logistics Requirements and Funding Plan<br />

Logistics Review Group<br />

Low Rate Initial Production<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!