12/14/2007<br />

1.231 Planning and <strong>Design</strong> <strong>of</strong> <strong>Airport</strong> <strong>System</strong> Dai Ohama<br />

estimated value <strong>of</strong> the option exercised in order to incorporate the flexibility into design can<br />

be calculated by the difference between the ENPV <strong>of</strong> Case C and that <strong>of</strong> Case B, which is<br />

¥52.3 billion. Table 4-7 shows the summary <strong>of</strong> this analysis. Case C, which holds<br />

flexibility in design has advantages over Case B in every aspect. Table 4-6 shows the<br />

summary <strong>of</strong> the analysis. [7] The initial investment in Case C is less than that <strong>of</strong> Case B,<br />

which means that the flexibility can reduce the initial investment. The ENPV, the<br />

maximum and minimum NPV in Case C is higher than that <strong>of</strong> Case B, so the flexibility can<br />

enhance the overall value <strong>of</strong> the project.<br />

Probability<br />

100.0%<br />

90.0%<br />

80.0%<br />

70.0%<br />

60.0%<br />

50.0%<br />

40.0%<br />

30.0%<br />

20.0%<br />

10.0%<br />

0.0%<br />

Cumulative distribution function<br />

Case B<br />

Average ENPV(B)<br />

¥569.3 B<br />

200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000<br />

Target value \ million<br />

Case C<br />

Case A<br />

(¥678.7 B)<br />

Option Value<br />

¥52.3 B<br />

Average ENPV(C)<br />

¥621.6 B<br />

Figure 4-5 Cumulative Distribution Function (Value at Risk)<br />

Table 4-7 Summary <strong>of</strong> the <strong>Analysis</strong><br />

Case B<br />

(No Flexibility)<br />

Case C<br />

(with Flexibility)<br />

Initial Investment (¥ in billion) 570.0 505.0<br />

ENPV (¥ in billion) 569.3 621.6<br />

Minimum NPV (¥ in billion) 339.3 338.1<br />

Maximum NPV (¥ in billion) 773.4 899.1<br />

Term Project: <strong>Flexible</strong> <strong>Design</strong> <strong>of</strong> <strong>Airport</strong> <strong>System</strong> Page 19 <strong>of</strong> 22