12/14/2007<br />
1.231 Planning and <strong>Design</strong> <strong>of</strong> <strong>Airport</strong> <strong>System</strong> Dai Ohama<br />
These areas such as PT/W and S/E would be used if airplanes depart from north to south<br />
and land from south to north. Thus, if they need this operation in the future, they should be<br />
constructed, otherwise they should not be constructed.<br />
2.4 Projected Capacity <strong>of</strong> <strong>Airport</strong><br />
So when are such departure and landing necessary? In the current plan, when north<br />
wind blows, runway B and D are used for departure and runway A and C are used for<br />
landing. When the south wind blows, runway A and C are used for departure and runway<br />
B and D are used for landing. In this planning, during south wind, only 12 a/c land at the<br />
runway D per hour, while during north wind 28 a/c depart from the runway D per hour.<br />
This is because runway usages are decided so that the entire capacity <strong>of</strong> the airport could be<br />
maximized. However, at the runway D, if airplanes depart from N to S and land from S to<br />
N, it is possible for the entire capacity <strong>of</strong> the airport to be increased.<br />
North Wind<br />
Departure: B-12 ac/hr<br />
D-28<br />
Landing : A-28 ac/hr<br />
C-12<br />
Total : 40 ac/hr<br />
South Wind<br />
Departure: A-22 ac/hr<br />
C-18<br />
Landing : B-28 ac/hr<br />
D-12<br />
Total : 40 ac/hr<br />
Figure 2-6 Currently <strong>Design</strong>ed Capacity<br />
Source: Ministry <strong>of</strong> Land, Infrastructure and Transport in Japan, Kanto Regional Development Bureau [2]<br />
2.5 <strong>Flexible</strong> <strong>Design</strong><br />
As a matter <strong>of</strong> fact, estimating this capacity is very complicated because all <strong>of</strong> four<br />