12/14/2007<br />

1.231 Planning and <strong>Design</strong> <strong>of</strong> <strong>Airport</strong> <strong>System</strong> Dai Ohama<br />

These areas such as PT/W and S/E would be used if airplanes depart from north to south<br />

and land from south to north. Thus, if they need this operation in the future, they should be<br />

constructed, otherwise they should not be constructed.<br />

2.4 Projected Capacity <strong>of</strong> <strong>Airport</strong><br />

So when are such departure and landing necessary? In the current plan, when north<br />

wind blows, runway B and D are used for departure and runway A and C are used for<br />

landing. When the south wind blows, runway A and C are used for departure and runway<br />

B and D are used for landing. In this planning, during south wind, only 12 a/c land at the<br />

runway D per hour, while during north wind 28 a/c depart from the runway D per hour.<br />

This is because runway usages are decided so that the entire capacity <strong>of</strong> the airport could be<br />

maximized. However, at the runway D, if airplanes depart from N to S and land from S to<br />

N, it is possible for the entire capacity <strong>of</strong> the airport to be increased.<br />

North Wind<br />

Departure: B-12 ac/hr<br />

D-28<br />

Landing : A-28 ac/hr<br />

C-12<br />

Total : 40 ac/hr<br />

South Wind<br />

Departure: A-22 ac/hr<br />

C-18<br />

Landing : B-28 ac/hr<br />

D-12<br />

Total : 40 ac/hr<br />

Figure 2-6 Currently <strong>Design</strong>ed Capacity<br />

Source: Ministry <strong>of</strong> Land, Infrastructure and Transport in Japan, Kanto Regional Development Bureau [2]<br />

2.5 <strong>Flexible</strong> <strong>Design</strong><br />

As a matter <strong>of</strong> fact, estimating this capacity is very complicated because all <strong>of</strong> four<br />

Term Project: <strong>Flexible</strong> <strong>Design</strong> <strong>of</strong> <strong>Airport</strong> <strong>System</strong> Page 5 <strong>of</strong> 22