Participant Technical Reference Manual - IESO

Participant Technical Reference Manual - IESO

Participant Technical Reference Manual - IESO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.Dispatch Information<br />

IMO_MAN_0024<br />

Dial-up telephone line<br />

Local<br />

Telco<br />

Office<br />

Local<br />

Loop<br />

Telecom<br />

Isolating<br />

Device<br />

Telecom<br />

Internal Wiring<br />

DSU<br />

FRAD<br />

Telecom<br />

Room<br />

UPS<br />

UPS<br />

Interconnect<br />

Cable<br />

RTU<br />

Market <strong>Participant</strong>’s Premises<br />

Equipment Room<br />

(Legend: <strong>IESO</strong> responsibility Market <strong>Participant</strong> responsibility )<br />

Figure 3-2: Responsibilities for Telecommunications and Site Readiness for RTUs<br />

227 The connection to the Real Time Network for a dispatch workstation requires<br />

the market participant to provide the following:<br />

a. Access for the communications carrier to the market participant site to install a local loop<br />

and other customer premises equipment.<br />

b. A dedicated dial-up telephone line connected to the Router to enable remote maintenance.<br />

c. Space to house the customer premises equipment (Router) in a suitable environment (e.g.<br />

dry, clean, 0 – 40 C, free of Electro-Magnetic interference, etc.)<br />

d. A suitable power source for the customer premises equipment, typically a reliable source of<br />

120V ac, 60 Hz.<br />

e. Access for maintenance personnel as needed.<br />

Local<br />

Telco<br />

Office<br />

Local<br />

Loop<br />

Telecom<br />

Isolating<br />

Device (if<br />

required)<br />

Telecom<br />

Room<br />

Dial-up Telephone Line<br />

Telecom<br />

Internal Wiring<br />

Router<br />

Interconnect<br />

Cable<br />

DWS<br />

RTU<br />

Market <strong>Participant</strong>’s Premises<br />

(Legend: <strong>IESO</strong> responsibility Market <strong>Participant</strong> responsibility )<br />

Figure 3-3: Responsibilities for Telecommunications and Site Readiness for DWS<br />

66 Public Issue 21.1 – March 15, 2010 - estimated