13.11.2014 Views

Participant Technical Reference Manual - IESO

Participant Technical Reference Manual - IESO

Participant Technical Reference Manual - IESO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Participant</strong> <strong>Technical</strong> <strong>Reference</strong> <strong>Manual</strong><br />

5. Market Applications<br />

The Energy Template is used to specify the bids or offers for various resources like generators,<br />

loads, off-takes and injections. This template can be used for data submission in any window<br />

and can be used to view the energy data. These will be version sensitive and new versions<br />

will be available to all Market participants when available. Older versions cannot be used<br />

when a new version is issued.<br />

The Bilateral Contract Template is used to specify the hourly amount exchanged between<br />

two Market participants. This template can also be used to view the bilateral contract data.<br />

Real Time Energy Schedule Template is used to specify the schedules for various<br />

resources. Market participants will use this template to send their schedule data to the <strong>IESO</strong>.<br />

This template can also be used to view the schedule data. This template can be used by<br />

market participants that are:<br />

Self-scheduling generators, or<br />

Intermittent generators<br />

Operating Reserve Template is used by market participants to send their bid/offer data to<br />

the <strong>IESO</strong>. It can also be used to view the operating reserve data. All operating reserve<br />

ancillary service data loading use the same template. There are 3 types of Reserves<br />

supported and they are 10-min Non-Spin Reserve, 10-min Spin Reserve & 30-min Reserve.<br />

The Capacity Reserve Bid Template is used to send bid/offer data to <strong>IESO</strong>. This template<br />

can also be used to view the bid/offer data.<br />

Note: The Capacity Reserve Market is not yet implemented.<br />

Public Market Information, which is available on the <strong>Technical</strong> Interfaces page of <strong>IESO</strong>‟s<br />

Web site, is used by Market participants to view the public market information and/or the<br />

market results.<br />

Private Market <strong>Participant</strong> Information, which is available via through the MPI or API is<br />

used by market participants to view their dispatch information.<br />

315 Although the <strong>IESO</strong> is not bound to rigorously follow any particular ISO<br />

standard it recognizes the benefit of taking some of them into account. ISO<br />

9001 regulations are considered in the attempt for achieving quality interfaces.<br />

5.1.3 Settlements Application<br />

316 The current Commercial Reconciliation system produces settlement statements.<br />

The <strong>IESO</strong> Funds Administration (FA) applications group produces invoices.<br />

Market participants have the ability to review and/or download the invoices<br />

through the <strong>IESO</strong> Reports web server. Settlement statements are similarly<br />

available through the <strong>IESO</strong> Reports web server.<br />

317 Detailed information regarding the precise format of settlement statement files<br />

and supporting data files is detailed on the <strong>Technical</strong> Interfaces page of <strong>IESO</strong>‟s<br />

Web site.<br />

318 Further information regarding charge type calculations may be found on the<br />

<strong>Technical</strong> Interfaces page of the <strong>IESO</strong>‟s Web site.<br />

Issue 21.1 – March 15, 2010 - estimated Public 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!