Equatorial Guinea - Campaign to End Fistula
Equatorial Guinea - Campaign to End Fistula
Equatorial Guinea - Campaign to End Fistula
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
OBJECTIVES, PRODUCTS<br />
ACTIVITIES<br />
PERIOD (Smstrs) PARTNERS<br />
SOURCE OF FUNDING (FCFA)<br />
AND PERIOD INDICATORS<br />
S1 S2 S3<br />
GOVT UNFPA EC TOTAL<br />
Product 3 (continuation): Reparation of conducted obstetric fistula cases with a post operation follow-up.<br />
Necessary available material<br />
for diagnosys and obstetric<br />
Revision and provision of necessary<br />
material for the diagnosys and obstetric x x x<br />
MINISABS/<br />
UNFPA/CE<br />
fistula repair.<br />
fistula repair.<br />
0 5.700.000 5.000.000 10.700.000<br />
Data recording books Adquisition of data recording books for<br />
MINISABS/<br />
available and utilized. consultations,<br />
operations, x x x<br />
hospitalisations and clinic records.<br />
0 700.000 0 700.000<br />
Vehicles and logistic support<br />
available <strong>to</strong> retrieve,<br />
transportate and mobilize<br />
women with obstetric fistula.<br />
Confirmed diagnosys of<br />
obstetric fistula cases in<br />
Malabo and Bata.<br />
Fungible, material and<br />
essential drugs available.<br />
Available chirurgical repair<br />
programmes in Malabo and<br />
Bata.<br />
Logistic support and vehicles <strong>to</strong><br />
retrieve, mobilize and transportation of<br />
women with obstetric fistula.<br />
Confirmation of diagnosys of obstetric<br />
fistula cases identified during the survey<br />
in Malabo and Bata hospitals.<br />
Contribution of acquisition of fungibles,<br />
material and essential drugs.<br />
Execution of chirurgical repair<br />
programmes in Malabo and Bata<br />
hospitals, assisted by Nigeria and Addis<br />
Abbeba teams.<br />
Economical motivation support<br />
programme <strong>to</strong> obstetric fistula repair<br />
team in Malabo and Bata hospitals.<br />
x x x<br />
x x x<br />
x x x<br />
x x x<br />
UNFPA/CE<br />
MINISABS/<br />
UNFPA/CE<br />
MINISABS/<br />
MINISABS/<br />
UNFPA/CE<br />
Available motivation<br />
programme on chirurgical<br />
obstetric fistula repair in<br />
Malabo and Bata.<br />
x x x<br />
Product 4: Women effective socio – economical reinsertion after obstetric fistula operations.<br />
Executed follow up activities. Women post operation follow up in<br />
conseiling and medicochirurgical x x x<br />
consultations.<br />
Operative in-come Assistance and promotion of women<br />
generation activities. income generation activities after x x x<br />
obstetric fistula operations.<br />
Psycosocial<br />
Familiar and community psycosocial<br />
accompaniement of women accompainement of women after<br />
after obstetric fistula obstetric fistula operations.<br />
x x x<br />
operations.<br />
MINISABS/<br />
UNFPA/CE<br />
MINISABS/<br />
UNFPA/CE<br />
MINISABS/<br />
UNFPA/CE<br />
1.500.000 2.500.000 0 4.000.000<br />
1.600.000 0 0 1.600.000<br />
0 5.700.000 4.000.000 9.700.000<br />
0 5.500.000 2.000.000 7.500.000<br />
3.500.000 2.500.000 0 6.000.000<br />
700.000 0 0 700.000<br />
10.000.000 3.000.000 3.000.000 16.000.000<br />
0 1.200.000 1.200.000 2.400.000<br />
SUB-TOTAL PAGE (2) 17.300.000 26.800.000 15.200.000 59.300.000<br />
GRAND TOTAL (Pages 1+2) 76.650.000 59.800.000 39.200.000 175.650.000<br />
40