TEST REQUIREMENTS<br />

PATTERSON PUMP COMPANY<br />

PO BOX 790 2129 AYERSVILLE ROAD<br />

TOCCOA, GEORGIA 30577<br />

ORDER FIRST USED ON:<br />

SC-C<strong>01</strong>09398<br />

ISSUED BY: MS DATE: 12/14/<strong>11</strong> PAGE: 1 of 1<br />

TR-<strong>22</strong>41<br />

JOB: 254743 CUSTOMER ORDER NUMBER: 4383-<strong>22</strong><strong>11</strong><strong>23</strong>00<br />

S/N: C<strong>01</strong>09398 PUMP MODEL: 18x14MAB<br />

SUCTION DIAMETER: 18 DISCHARGE DIAMETER: 14 IMPELLER PATTERN: C-5762<br />

RATED POINT #1<br />

GPM: 6944<br />

HEAD: 179<br />

RPM: <strong>11</strong>80<br />

EFFICIENCY REQUIRED: 89%<br />

MAXIMUM BHP PERMISSIBLE: 400<br />

ROTATION:<br />

CW<br />

SUBMITTAL REQUIRED:<br />

X<br />

TEST ARRANGEMENT: Std. ASSEMBLY SECTION:<br />

NUMBER OF PUMPS TO BE TESTED: 3 GENERAL ARRANGEMENT: Std.<br />

WITNESS TEST: CERTIFIED TEST: X SHOP TEST: X FIELD TEST:<br />

X P.E. STAMP REQUIRED (give requirements to witness P.E.)<br />

TEST RANGE<br />

CAPACITY: Shut off GPM to Run out GPM<br />

HEAD: FT to FT<br />

SPEED: full RPM to full RPM<br />

POSITIVE SUCTION HEAD: SUCTION LIFT: X<br />

NUMBER OF TEST POINTS REQUIRED: 10 minim TEST POINT SPACING: std<br />

CURVE DATA REQUIRED<br />

H/Q: x SHUTOFF: x BHP/KW: x NPSH: PUMP EFFICIENCY: x<br />

OVERALL EFFICIENCY:<br />

x<br />

HYDROSTATIC PRESSURE: 135 PSI TIME: 10 min<br />

MOTOR(s) TO BE USED: JOB VOLTAGE: 460 HP: 400<br />

INDUCTION: X SYNCHRONOUS:<br />

MOTOR EFFICIENCY: COMPLETE TEST MOTOR COUPLING: JOB<br />

SPECIAL REQUIREMENTS<br />

1. See SPECS SECTION <strong>22</strong>-<strong>11</strong>-<strong>23</strong>.<strong>01</strong> /1.03 for other test requirements<br />

2. Submit test results for approval for all three pumps.<br />

3. Notify the Engineer starting date of the test.<br />

Form A04.10 9/28/95