ABBREVIATED LIST OF SPLIT CASE<br />
PUMP INSTALLATIONS<br />
Owner: The City of Wichita Water & Sewer Department<br />
Address: 1815 W. Pine, Wichita, KS 67203<br />
Contact: Mr. Jerry Blain - Superintendent Production and pumping @ 316-269-4764<br />
Project/Location: Hess Pump Station, Wichita, Kansas<br />
Year of Installation: 1997<br />
S/N QTY MODEL FLUID GPM TDH HP RPM<br />
C006933-<strong>01</strong>-03 3 30 X 24 MAA Raw/Fin. Water 20,000 300 1980 900<br />
C006933-04 1 30 X 24 MAA Raw/Fin. Water 20,000 302 1980 880<br />
C006933-05 1 30 X 24 MAA Raw/Fin. Water 17,500 264 1980 900<br />
Owner: The City of Wichita Water & Sewer Department<br />
Address: 1815 W. Pine, Wichita, KS 67203<br />
Contact: Mr. Jerry Blain - Superintendent Production and pumping @ 316-269-4764<br />
Project/Location: Cheyney Pump Station, Wichita, Kansas<br />
Year of Installation: 1995 & 1997<br />
S/N QTY MODEL FLUID GPM TDH HP RPM<br />
C004307 2 30 X 24 MAA Raw/Fin. Water 14,000 200 1000 705<br />
C0<strong>01</strong>454 2 30 X 24 MAA Raw/Fin. Water 20,600 264 1980 900<br />
Owner: City of Dalton, Georgia<br />
Address: PO Box 869, Dalton, GA 307<strong>22</strong>-0869<br />
Contact: Public Works Department @ 706 278-7077<br />
Project/Location: Loopers Bend Water Reclamation Facility, Dalton, GA<br />
Year of Installation: 1999 & 2000<br />
S/N QTY MODEL FLUID GPM TDH HP RPM<br />
C<strong>01</strong>3765 4 24 x 16 MAAS Treated Effluent 12,000 219 800 880<br />
C0<strong>22</strong>564 2 24 x 16 MAAS Treated Effluent 12,000 <strong>22</strong>0 800 880<br />
C0<strong>22</strong>565 2 12 x 8 MAA Raw/Fin. Water 3,000 215 200 <strong>11</strong>80<br />
Owner: Gwinnett County, Georgia<br />
Address: 684 Winder Highway, Lawrenceville, GA 30045<br />
Contact: Mr. Reza Baniassad, Water Production Engineer @ 770-904-3202<br />
Project/Location: Lanier Water Treatment Plant<br />
Year of Installation: 20<strong>01</strong>, 2003 & 2007<br />
S/N QTY MODEL FLUID GPM TDH HP RPM<br />
C003310 4 36 x 30 MAA Raw/Fin. Water 35,415 129 1500 590<br />
C0033<strong>11</strong> 3 20 x 18 MAA Raw/Fin. Water 10,070 159 500 590<br />
C053404 3 30 X 24 MAA Raw/Fin. Water 17,500 <strong>22</strong>0 1500 705