Upgrading and Migrating an IQ database from older ... - Sybase
Upgrading and Migrating an IQ database from older ... - Sybase
Upgrading and Migrating an IQ database from older ... - Sybase
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ASE 15 Upgrade Checklist for <strong>Upgrading</strong> <strong>from</strong> ASE 12.x <strong>Sybase</strong> ASE 15<br />
_________________________________________________________________________________________________<br />
o<br />
o<br />
o<br />
Evaluate data/batch needs for all the interfaces:<br />
• Downtime required for migration/upgrade <strong><strong>an</strong>d</strong> post upgrade checks/tests.<br />
• Ch<strong>an</strong>ges to system functions/comm<strong><strong>an</strong>d</strong>s affecting the upstream / downstream<br />
applications.<br />
• Pay close attention to data-type conversion <strong><strong>an</strong>d</strong> format issues.<br />
Evaluate specific ASE features in use for special needs:<br />
• CIS, JAVA, XML, Replication, Parallelism, DTM/ASTC/rpc etc.<br />
• Review default settings <strong><strong>an</strong>d</strong> document <strong>an</strong>y extra/special steps required to ensure that<br />
the functionality <strong><strong>an</strong>d</strong> data are not impacted.<br />
Evaluate Rollback strategies:<br />
• Include dump <strong><strong>an</strong>d</strong> load times required to restore the system to pre-upgrade state.<br />
• Set clear “GO-no-GO” decision timeframes.<br />
Evaluate ASE’s new features.<br />
Include time to create a tactical pl<strong>an</strong>.<br />
Include time to create a test pl<strong>an</strong>.<br />
Include time to build a test environment.<br />
STEP 1.18: CREATE A TACTICAL PLAN<br />
1.18.1: PURPOSE<br />
The Tactical Pl<strong>an</strong> outlines the specific steps you must take in order to perform the actual upgrade.<br />
1.18.2: CONSIDERATIONS<br />
Consider the following when developing your tactical pl<strong>an</strong>:<br />
Include <strong>an</strong>y inter-step dependencies <strong><strong>an</strong>d</strong> recovery pl<strong>an</strong>s in case something goes wrong.<br />
Specify your rollback strategies:<br />
o Include dump <strong><strong>an</strong>d</strong> load times required to restore the system to pre-upgrade state.<br />
o Set clear “GO-no-GO” decision timeframes.<br />
Include dump <strong><strong>an</strong>d</strong> load times required to restore the system to the pre-upgrade state.<br />
Set clear “GO-no-GO” decision timeframes.<br />
___________________________________________________________________________________________________________<br />
ASE 15 Upgrade Checklist for ASE 12.X v3.0 Page 51 of 97 Last Update: May, 2012