You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4.3 Installing, assembling and commissioning<br />
The packaged <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> High Pressure Freezer must be transported with a<br />
forklift truck or a pallet hoist.<br />
4.3.1 Unpacking and assembling the parts<br />
After selecting the installation location, remove the top cover and all side panels of<br />
the wooden crate.<br />
Remove the packaging material in the crate. Do not remove plastic packaging from<br />
around the machine. Place all included boxes in a secure place to the side.<br />
Page 13 <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> Operating Manual Version 12/10