25.11.2014 Views

Leica EM HPM100

Leica EM HPM100

Leica EM HPM100

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fill the specimen Dewar with liquid nitrogen before freezing.<br />

Open the specimen Dewar drawer by pulling the drawer away from the machine.<br />

Position the LN 2 filled specimen Dewar firmly against the metal holder and then close<br />

the drawer.<br />

Specimen LN Dewar<br />

Metal holder<br />

When the system is fully cooled (approximately 30 minutes after the internal LN 2<br />

pump starts) and the small LN 2 Dewar is filled, the main screen shows “ready for<br />

freezing” in the top left corner. The freezing process can begin.<br />

5.2.3 Inserting the specimen holder in the loading station<br />

The loading mechanism must be open to insert the three-piece cartridge consisting of<br />

an upper cylinder, carrier plate and lower cylinder.<br />

Open the loading mechanism by rotating it towards you into the front locking position<br />

with the loading lever.<br />

Hold the bottom half of the closure with the right forefinger and turn the top half to a<br />

vertical position with the loading lever.<br />

Front locking<br />

position of the<br />

loading<br />

mechanism<br />

Loading lever<br />

Page 35 <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> Operating Manual Version 12/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!