4.3.2 Setup<br />
The <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> is moved to the installation location on the integrated rollers.<br />
Release the roller brakes and set them again once the final position has been<br />
reached.<br />
The back rollers have a fixed direction. The front rollers can swivel for steering<br />
the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> when it is being moved.<br />
Avoid moving the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> over slopes and uneven ground. The<br />
system must never be tilted more than 3°.<br />
The system must be installed on a hard floor or on a floor plate that is at least 100 cm<br />
deep and 70 cm wide.<br />
Sufficient space is required to allow comfortable operation of the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong><br />
and also for maintenance and service. Reserve a minimum working distance of 20<br />
cm at the back and right and 60 cm at the front and left.<br />
4.3.3 Safe storage of the packing material<br />
The packing material for the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> must be kept safely for use if the<br />
system is shipped again, since the system may be damaged if it is not transported in<br />
the original packing. Store the packaging for the parts and the floor of the crate with<br />
the side panels of the lagging.<br />
4.3.4 Electrical connections<br />
The electrical terminal is on the back of the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong>. Power is supplied via<br />
a connector for non-heating appliances. Install a country-specific electrical plug to<br />
connect the power supply at the installation location.<br />
4.3.5 Commissioning<br />
The <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> is commissioned by employees of <strong>Leica</strong> Microsystems<br />
and specially trained and authorized technicians.<br />
Before commissioning the system, carry out the following steps:<br />
• unpack the <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong><br />
• install the high pressure freezer<br />
• connect the power<br />
Once the above steps have been completed, commissioning involves following the<br />
operator actions to ensure the machine is functioning properly.<br />
4.3.6 Repacking to prevent damage during transportation<br />
To disassemble and pack the system, carry out the steps for assembly and<br />
unpacking in reverse order.<br />
Page 25 <strong>Leica</strong> <strong>EM</strong> <strong>HPM100</strong> Operating Manual Version 12/10