Worm Gear—The worm gear should be inspected<br />

monthly and lubricated when needed.<br />

Remove the worm gear box to inspect. See parts<br />

diagram for location.<br />

Chain—The table height adjustment chain<br />

should be inspected monthly and lubricated when<br />

needed. A good quality bicycle chain lubricant<br />

works well for periodic lubrication.<br />

Gear Box—Gear box oil should be drained after<br />

the first 20 hours of operation. See Figure 23 &<br />

24. Replace with 80W-90 gear oil. Inspect levels<br />

periodically and change yearly. Replace gear oil<br />

more frequently under heavy use. Fill until oil<br />

reaches the top of the filler plug port for correct oil<br />

level.<br />

Drive Chain—The drive chain should be inspected<br />

and lubricated monthly. Check the sprocket,<br />

the chain and the cotter pin during inspection.<br />

Use a general purpose grease. Some chains will<br />

have master links instead of cotter pins.<br />

Feed Rollers—The infeed/outfeed pressure<br />

setscrews double as lubrication ports for the<br />

rollers. See Figure 25. Add 1-2 drops of light<br />

machine oil to all ports before each use. Daily<br />

lubrication of the feed rollers is crucial to the operation<br />

of your planer. Lubricate before start-up.<br />

Apply a light oil, making sure that the lubricant<br />

penetrates the bearing.<br />

Figure 25. Feed roller lubrication points.<br />

Figure 23. Gearbox fill point.<br />

Figure 24. Gearbox oil drain point.<br />

-26- G0550/G0551 15" Planer