“A Stitch in Time...”
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 31-Connections for test<strong>in</strong>g <strong>in</strong>sulation resistance between one wire and all other wires<br />
connected, without be<strong>in</strong>g affected by leakage to ground.<br />
Figure 32-Show<strong>in</strong>g use of spr<strong>in</strong>g collar as a Guard connection to elim<strong>in</strong>ate the effects of surface<br />
leakage. The device under test must be disconnected from all other equipment.<br />
A STITCH IN TIME 55