Figure 31-Connections for test<strong>in</strong>g <strong>in</strong>sulation resistance between one wire and all other wires<br />

connected, without be<strong>in</strong>g affected by leakage to ground.<br />

Figure 32-Show<strong>in</strong>g use of spr<strong>in</strong>g collar as a Guard connection to elim<strong>in</strong>ate the effects of surface<br />

leakage. The device under test must be disconnected from all other equipment.<br />

A STITCH IN TIME 55