28.11.2014 Views

Fairfield Transport Interchange Upgrade - Transport for NSW

Fairfield Transport Interchange Upgrade - Transport for NSW

Fairfield Transport Interchange Upgrade - Transport for NSW

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Fairfield</strong> <strong>Transport</strong> <strong>Interchange</strong><br />

Determination Report<br />

Issue<br />

No.<br />

Submission<br />

No.<br />

Issues raised<br />

be opposite the new taxi rank.<br />

8. FAIR 18 Concern about the relocation of the loading zones especially<br />

<strong>for</strong> businesses unloading bulky goods and furniture.<br />

9. FAIR 6 New commuter car park should at least take up the whole<br />

area between the boundaries of the two existing commuter<br />

car parks.<br />

10. FAIR 5 There needs to be a bicycle rack near the entrance on the<br />

north side of the station.<br />

11. FAIR 13 Provide bicycle lockers or bicycle cage under cover to store<br />

more expensive electric bikes.<br />

<strong>Transport</strong> <strong>for</strong> <strong>NSW</strong> response<br />

Crescent cannot be relocated to the car park west of the <strong>Fairfield</strong><br />

Connection as timed shopper parking displaced by the upgraded<br />

interchange is to be relocated to this car park. These displaced<br />

commuter car parking spaces would be relocated to the new commuter<br />

car park in Wilga Street on the southern side of the rail line. For details<br />

refer to Section 3.3 and Appendix 5 of the Determination Report.<br />

<strong>Transport</strong> <strong>for</strong> <strong>NSW</strong> will consult further with Council to investigate<br />

loading zones as close to the existing loading zones to minimise<br />

impacts on local businesses. Refer to Condition of Approval 36 of this<br />

Determination Report.<br />

Refer to Issue No. 5 above.<br />

A bicycle rack will be provided near the station entrance on the north<br />

side of the rail line. Refer to figure 3.3 in REF (Volume 1) and<br />

Appendix 5 of the Determination Report.<br />

The bicycle facilities proposed near the entrance of the station on each<br />

side of the rail line are under shelter in a well lit and visible area of the<br />

interchange. Refer to Appendix 5 of the Determination Report <strong>for</strong><br />

further details.<br />

12. FAIR 13 Provide bike path along The Crescent. Due to the re-configuration of the interchange and the existing busy<br />

retail and road traffic through the area around The Crescent there is<br />

not enough space to include a shared zone or a dedicated bike path.<br />

The safety of the public and staff is of paramount importance in the<br />

design and development of all public space, particularly so with the<br />

interchange facilities because of the high volume of users and the<br />

extended hours over which this occurs. Refer to figures 3.4 to 3.7 and<br />

sections 6.1.2 and 6.2.2 in REF (Volume 1).<br />

13. FAIR 30 New metered parking areas will make access to the existing<br />

commuter parking area more difficult.<br />

This proposal does not include <strong>for</strong> the installation of any metered<br />

parking. There will be timed parking however, it will be free of charge.<br />

Ref No: 1452311 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!