Cell Descriptions - South East Natural Resources Management Board
Cell Descriptions - South East Natural Resources Management Board
Cell Descriptions - South East Natural Resources Management Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SE9 – Lake St George, Lake St Clair, Beachport<br />
Component Issue Proposed Action Priority of Key Players<br />
Action<br />
Coastal dunes<br />
and lake edges<br />
immediately<br />
north of<br />
Beachport CP,<br />
and between<br />
Euro Point<br />
and Lake<br />
George<br />
Beachport to<br />
Nora Creina<br />
dunes and<br />
headlands.<br />
Low lying<br />
trough<br />
between<br />
Guichen and<br />
Rivoli Bay,<br />
including<br />
Lakes George,<br />
St Clair and<br />
Eliza<br />
Lake George<br />
and Lake St<br />
Clair<br />
These include vegetated<br />
dunes and an area of M.<br />
halmaturorum of high<br />
conservation value,<br />
bounded by the park and<br />
drifting sand dunes.<br />
Threatened by ORV<br />
activity and sand drift.<br />
ORV damage<br />
widespread.<br />
Aggressive weeds<br />
recorded at isolated<br />
locations in the dunes<br />
throughout the cell.<br />
Lidar survey suggests<br />
possible flooding by<br />
continuing and<br />
accelerating sea level rise<br />
within planning<br />
timeframes.<br />
Sediment blocking the<br />
marine connection to<br />
Lake George (together<br />
with low flows via Drain<br />
M) has led to periods of<br />
eutrophication; this<br />
threatens valuable<br />
lakeside habitats.<br />
Climate change threatens<br />
water levels in both<br />
lakes, salinity and<br />
sedimentation.<br />
DENR to discuss<br />
preservation of this<br />
area with the<br />
landowner, by<br />
inclusion within the<br />
park or by heritage<br />
agreement.<br />
Support local effort to<br />
close damaging<br />
informal tracks is<br />
important in this cell.<br />
Eradication should be<br />
considered for those<br />
with limited<br />
distribution at present.<br />
Regular monitoring<br />
for alert weeds, listed<br />
in Section 4.9.<br />
Scoping of timelines<br />
and implications for<br />
possible adaptation of<br />
infrastructure, and<br />
vulnerable habitats.<br />
Build higher storm<br />
tide level into adaptive<br />
management of gate at<br />
Lake George entrance.<br />
1. As a temporary<br />
measure ensure<br />
marine connection<br />
through grading/<br />
dredging.<br />
2. Establish a review<br />
of the management of<br />
the outlet, in view of<br />
the conservation<br />
values of the lake and<br />
its surrounds and sea<br />
level rise.<br />
3. Establish<br />
monitoring baselines<br />
for water levels in<br />
both lakes, salinity,<br />
and sedimentation.<br />
Medium<br />
(Cons)<br />
High<br />
(Cons/<br />
Threat)<br />
Medium<br />
(Cons/<br />
threat<br />
Medium<br />
(cell)<br />
Medium<br />
(cell)<br />
Landowners,<br />
DENR<br />
Landowners,<br />
NRM, DENR<br />
DENR, NRM,<br />
landowners<br />
DPC, DENR,<br />
Councils, NRM,<br />
DPLG<br />
SEWCDB,<br />
DENR,.NRM<br />
Limestone Coast and Coorong Coastal Action Plan 353