E n v i r o n m e n t<br />

In the autumn 1990, a document describing the Environmental<br />

Goals for the Lillehammer Games 1994 was completed. This<br />

document contained requirements for an “Environmental<br />

construction of arenas”. Emphasis was to be put on the<br />

following:<br />

f Take into account the region’s cultural values and the local<br />

economic base<br />

f Adapt the architecture to the region’s own identity<br />

f Aim at achieving environmental solutions for excavated<br />

mass and for landscape architecture<br />

f Allow for energy economisation measures and recycling of<br />

materials<br />

f Emphasize national goals for the work environment, health<br />

and safety<br />

P r o j e c t<br />

The project directors and project managers were central in<br />

coordinating all activities at the various arenas, also for<br />

activities that for financial or contractual reasons were<br />

assigned to other departments.<br />

The last 6 months of 1993, there was a need to hire technical<br />

personnel who could run the operations at the arenas during<br />

the Games. The result was that the project managers for the<br />

various construction projects and site engineers took over<br />

these functions. The Equipment/installations Department<br />

functioned as a maintenance service for the temporary<br />

b u i l d i n g s .<br />

After the Lillehammer Games, the Construction Department<br />

was merged with the Material Administration and Acquisition<br />

Departments in order to better coordinate the demobilisation<br />

activities at the arenas and organise the sale of equipment and<br />

material.<br />

A d m i n i s t r a t i o n , o p e r a t i o n s a n d<br />

m a i n t e n a n c e ( A O M )<br />

Separate premises were developed for AOM and AOMdocumentation<br />

and were compiled in a separate document. In<br />

terms of requirements for functionality, energy economization<br />

and choice of materials, this document did not specify any<br />

demands beyond that which was already specified in other<br />

premise documents.<br />

The scope of the requirements for documentation were<br />

significantly larger than what had been previously the case for<br />

such large construction projects.<br />

The Press<br />

Main Accreditation Centre (MPC)<br />

(including access roads and parking facilities)<br />

Equipment/installations<br />

Temporary buildings<br />

Inventory and equipment<br />

Electrical installations<br />

Signs and festival elements