Many of <strong>the</strong> tests ended after 48 hours; however, <strong>in</strong> some cases <strong>the</strong> runoff had not<br />

completely dra<strong>in</strong>ed through <strong>the</strong> silt fence fabrics. The relationship of <strong>the</strong> runoff level<br />

with respect to time <strong>for</strong> <strong>the</strong> last 24 hours of <strong>the</strong> test can be approximated by a l<strong>in</strong>ear<br />

function. The time <strong>for</strong> <strong>the</strong> flume to dra<strong>in</strong> completely was estimated by extrapolat<strong>in</strong>g<br />

l<strong>in</strong>early from <strong>the</strong> last few data po<strong>in</strong>ts. A typical test where runoff rema<strong>in</strong>ed <strong>in</strong> <strong>the</strong> flume<br />

even after 48 hours and <strong>the</strong> estimated time of complete dra<strong>in</strong>age is presented <strong>in</strong> Figure<br />

5.5.<br />

L<br />

0.40<br />

0.35<br />

0.30<br />

0.25<br />

0.20<br />

0.15<br />

0.10<br />

0.05<br />

0.00<br />

Fill<strong>in</strong>g<br />

Dra<strong>in</strong><strong>in</strong>g<br />

0 1440 2880 4320 5760 7200 8640<br />

Time, m<strong>in</strong><br />

Observed<br />

Estimated<br />

Figure 5.5 Observed Levels Dur<strong>in</strong>g a Flume Test and <strong>the</strong> Extrapolated Time <strong>for</strong><br />

Complete Dra<strong>in</strong>age<br />

5.1.8 TSS Removal Efficiency<br />

The observed TSS removal efficiency range, mean, median, and standard<br />

deviation <strong>for</strong> each silt fence are presented <strong>in</strong> Table 5.6. Individual test results are given <strong>in</strong><br />

Appendix D. Removal efficiencies were based on <strong>in</strong>fluent and effluent suspended solids<br />

mass loads. Calculations of <strong>the</strong>se removal efficiencies also are provided <strong>in</strong> Appendix D.<br />

The highest removal efficiencies were observed <strong>for</strong> <strong>the</strong> non-woven Mirafi fabric.<br />

This fabric also had <strong>the</strong> lowest flow rates of <strong>the</strong> fabrics tested. Increased detention time<br />

<strong>for</strong> <strong>the</strong> suspended solids beh<strong>in</strong>d <strong>the</strong> silt fence lead to <strong>in</strong>creased removal efficiency.<br />