TRANSPARENCY<br />
Energie & Mines<br />
44<br />
b. all candidates to be given the possibility<br />
to comp<strong>et</strong>e for these contracts ;<br />
c. transactions to be ma<strong>de</strong> in the best<br />
conditions of savings, transparency and<br />
efficiency for Sonatrach. These are the<br />
objectives of this directive.<br />
Definition, purpose of the<br />
directive<br />
1. Définitions<br />
For the purposes of this directive, the<br />
following terms and expressions mean :<br />
Sonatrach : National company for the<br />
research, production, transportation,<br />
transformation and mark<strong>et</strong>ing and sale of<br />
hydrocarbons, called Sonatrach/SPA<br />
whose registered office is in Djenane<br />
El Malik, Hydra, Algiers.<br />
The prime contractor : Any Sonatrach<br />
structure to which is <strong>de</strong>volved the<br />
responsibility for executing projects<br />
and/or purchasing supplies and carrying<br />
out supply works and establishing<br />
installations and physically quantifiable<br />
services.<br />
Supplier or entrepreneur : Any candidate<br />
or ten<strong>de</strong>rer to a contract for supplies,<br />
carrying out supply works and<br />
establishing installations and services<br />
which are related to them and all physically<br />
quantifiable services.<br />
Supplies : The durable or perishable<br />
goods of all kinds which the supplier or<br />
the entrepreneur must supply and/or<br />
incorporate by virtue of the contract,<br />
particularly inclu<strong>de</strong> the base products,<br />
the raw materials, the materials, the<br />
machines, the equipment, the <strong>de</strong>vices<br />
and elements, the consumables as well<br />
as the services related to them.<br />
Exclu<strong>de</strong>d from this <strong>de</strong>finition is the<br />
equipment which belongs to the supplier<br />
or to the entrepreneur which<br />
remains his property and his sole<br />
responsibility.<br />
Works : The carrying out, particularly<br />
for industrial units, of works related to<br />
the construction of industrial or administrative<br />
buildings, roads, infrastructures,<br />
putting in place hydrocarbon<br />
pipelines or those for other fluids as<br />
well as the services related to them.<br />
Installations : The materials and<br />
equipment to be supplied and to be<br />
november 2005<br />
assembled as well as the assembly services<br />
which the entrepreneur must execute<br />
by virtue of the contract.<br />
Services : The site preparation operations,<br />
including the use of the entrepreneur’s<br />
equipment, the assembly, the<br />
tests, the preliminary commissioning,<br />
the commissioning, the use and training,<br />
<strong>et</strong>c.<br />
Services related to the supplies, supply<br />
works and establishing of installations<br />
: The services related to<br />
transportation, installation and commissioning,<br />
training, initial maintenance,<br />
insurances and any other service<br />
accompanying the supplies, supply<br />
works and establishment of installations.<br />
Physically quantifiable services : The<br />
industrial services, such as the seismic,<br />
drilling and cartography services and<br />
other similar operations, as well as the<br />
non-industrial services such as the<br />
renovation, accommodation, transportation,<br />
<strong>et</strong>c.<br />
This term does not cover the immaterial<br />
services and advice.<br />
Complex and extensive contracts :<br />
Contracts whose purpose is the <strong>de</strong>sign,<br />
the realisation, the renovation of units,<br />
factories and production, transformation,<br />
packaging and storage facilities<br />
for hydrocarbons and by-products. The<br />
complexity and the extent are assessed<br />
by reference particularly to the technologies<br />
and processes implemented, to<br />
the timeframes and costs to compl<strong>et</strong>e<br />
the works, to the expected revenue, to<br />
the implications on the installations,<br />
the production, the environment,<br />
employment, health, saf<strong>et</strong>y, <strong>et</strong>c.<br />
For indication only, we will cite the<br />
transformation factories (liquefaction,<br />
refining, <strong>et</strong>c.), the hydrocarbons’ production<br />
centres, the large pipelines and<br />
connected works, the packaging and<br />
storage units, <strong>et</strong>c.<br />
2. Purpose of the directive<br />
The purpose of this directive is to <strong>de</strong>fine<br />
the rules for awarding Sonatrach<br />
contracts in terms of supplies, work<br />
supplies, establishing installations and<br />
physically quantifiable services.<br />
These rules particularly govern the preparation<br />
and the establishment by the<br />
prime contractor of the appeal for ten<strong>de</strong>rs’<br />
documents for each contract, on<br />
the basis of standard Sonatrach appeal<br />
for ten<strong>de</strong>rs’ documents.<br />
The relations b<strong>et</strong>ween the prime<br />
contractor and the ten<strong>de</strong>rers for a given<br />
appeal for ten<strong>de</strong>rs are exclusively<br />
governed by the appeal for ten<strong>de</strong>rs’<br />
document.<br />
The general principles<br />
of awarding contracts<br />
The open appeal for ten<strong>de</strong>rs<br />
The awarding of contracts in terms of<br />
supplies, work supplies and establishing<br />
installations and physically quantifiable<br />
services is done through an open<br />
appeal for ten<strong>de</strong>rs in two (2) distinct<br />
phases, such as <strong>de</strong>scribed in this directive<br />
(Section IV).<br />
First stage (technical stage) :<br />
Public opening of the ten<strong>de</strong>rs, assess-