Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The stages in assembling<br />
a mobile flow rack<br />
Standard dynamic rack – 4 assembly stages<br />
Stage 1<br />
Construct the base.<br />
166<br />
Stage 3<br />
Fit the lateral tubes/<br />
roller track supports.<br />
Stage 4<br />
Insert roller tracks.<br />
Stage 2<br />
Fit the sides.<br />
�<br />
Cut the MB-400 tubes to the desired length,<br />
establish the corresponding hole pattern of<br />
the MB-P, and drill the tubes accordingly.<br />
�<br />
Screw the MB-400 profile to the MB-P base<br />
with the M8 bolt and nut set.<br />
�<br />
Add the optional accessories: front drawbar,<br />
rear coupling, fork lift guide.<br />
Assembly of a<br />
Metal-Base ® cart<br />
Reinforced bases are quick<br />
and simple to construct:<br />
�<br />
Assemble the tubular LeanTek ®<br />
superstructure on the Metal Base.<br />
�<br />
Possible applications: flow racks,<br />
inventory containment, material transport.<br />
167