11.11.2012 Views

• ANGLAIS TECH - Trilogiq

• ANGLAIS TECH - Trilogiq

• ANGLAIS TECH - Trilogiq

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The stages in assembling<br />

a mobile flow rack<br />

Standard dynamic rack – 4 assembly stages<br />

Stage 1<br />

Construct the base.<br />

166<br />

Stage 3<br />

Fit the lateral tubes/<br />

roller track supports.<br />

Stage 4<br />

Insert roller tracks.<br />

Stage 2<br />

Fit the sides.<br />

�<br />

Cut the MB-400 tubes to the desired length,<br />

establish the corresponding hole pattern of<br />

the MB-P, and drill the tubes accordingly.<br />

�<br />

Screw the MB-400 profile to the MB-P base<br />

with the M8 bolt and nut set.<br />

�<br />

Add the optional accessories: front drawbar,<br />

rear coupling, fork lift guide.<br />

Assembly of a<br />

Metal-Base ® cart<br />

Reinforced bases are quick<br />

and simple to construct:<br />

�<br />

Assemble the tubular LeanTek ®<br />

superstructure on the Metal Base.<br />

�<br />

Possible applications: flow racks,<br />

inventory containment, material transport.<br />

167

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!