12.01.2015 Views

and conference programme - Passenger Terminal Expo

and conference programme - Passenger Terminal Expo

and conference programme - Passenger Terminal Expo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11.20-11.55 Strategic positioning of the FRA hub<br />

Martin Bien, executive vice-president, Fraport AG/Frankfurt Airport, Germany<br />

The presentation will include general trends in developing major hubs, competition between<br />

major hubs in Europe <strong>and</strong> the Middle East <strong>and</strong> positioning of FRA, <strong>and</strong> the requirements of<br />

airlines. It will also cover the most important success factors of hubs: the influence of P2P<br />

traffic, traffic forecasts <strong>and</strong> traffic structure for originating <strong>and</strong> transfer passengers, capacity<br />

dem<strong>and</strong> <strong>and</strong> capacity development at FRA for runways, aircraft-st<strong>and</strong>s, terminals, parking,<br />

<strong>and</strong> access. We will also discuss the restructuring of existing <strong>Terminal</strong> 1 <strong>and</strong> <strong>Terminal</strong> 2 to<br />

meet future requirements, positioning of products <strong>and</strong> services for passengers <strong>and</strong> their bags,<br />

quality levels, <strong>and</strong> cost efficiency.<br />

11.55-12.15 Discussion <strong>and</strong> chairman’s closing remarks<br />

12.15 Lunch – networking lunch in the Delegate Dining Area<br />

Importance of an Operational Readiness Program<br />

for Future Airport <strong>and</strong> <strong>Passenger</strong> <strong>Terminal</strong> Openings<br />

Please note: Each presentation’s allotted time includes five minutes for questions.<br />

Airport <strong>and</strong> passenger terminal operators have become insecure about their operational<br />

readiness preparation for their new facilities. Can chaos be prevented What would be<br />

the right steps to take We look at the methods <strong>and</strong> processes adopted for recent <strong>and</strong><br />

future openings.<br />

14.00-14.10 Introduction by chairman<br />

Reinhard Zeiler, head of airport consulting, Munich Airport International<br />

14.10-14.45 London Heathrow <strong>Terminal</strong> 5 opening<br />

David Lawrence, T5 launch readiness, British Airways, UK<br />

An overview of the opening of London Heathrow <strong>Terminal</strong> 5, including what went well <strong>and</strong><br />

lessons learned. Insight into the planning <strong>and</strong> delivery of a major airline relocation.<br />

14.45-15.20 Singapore Changi Airport – opening of the new <strong>Terminal</strong> 3<br />

Lye Teck Tan, deputy director-general (development), Civil Aviation Authority<br />

of Singapore, Singapore<br />

A presentation on the considerations <strong>and</strong> steps taken at Singapore Changi Airport to prepare<br />

for a smooth opening of its new <strong>Terminal</strong> 3. The operational opening took place on 9 January<br />

2008. An insight into the useful items to consider in planning the operational opening of a<br />

new terminal.<br />

Room:<br />

Al Thuraya A<br />

Importance of an Operational Readiness Program for<br />

Future Airport <strong>and</strong> <strong>Passenger</strong> <strong>Terminal</strong> Openings<br />

DAY two 17 November 2008<br />

15.20-15.30 Short refreshment break<br />

www.pteme.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!