<strong>Wallis</strong> <strong>Lake</strong> <strong>Estuary</strong> <strong>Management</strong> Plan<br />
E.6.1<br />
Employ a river keeper or other paid worker<br />
to maintain and restore vegetation in riparian zones<br />
E.6.2 E.6.3 M.6.1<br />
Conduct a riparian Concentrate revegetation and restoration Implement the Lower<br />
vegetation assessment efforts in priority areas identified in E.6.2 Wallamba River rivercare plan<br />
It is preferable (but not essential – indicated by the dashed lines here) that a river keeper be employed (action<br />
E.6.1) to coordinate efforts to assess (E.6.2) and revegetate/restore (E.6.3) riparian vegetation and to implement<br />
the Lower Wallamba River rivercare plan.<br />
C.4.1<br />
Develop best practice guidelines<br />
for human-dolphin interactions<br />
C.4.2<br />
Consider erecting signage summarising boat<br />
operator guidelines developed in C.4.1 for<br />
when dolphins are encountered<br />
Best practice guidelines for human-dolphin interactions, including persons in water and in powered vessels (action<br />
C.4.1), need to be developed and adopted prior to their communication via signage at major boat ramps (action<br />
C.4.2).<br />
S.1.1<br />
Conduct a contour study of<br />
the island/entrance area<br />
S.1.2<br />
Prepare an REF/EIS and conduct<br />
urgent dredging operations<br />
It is important that an initial contour study of the lake (action S.1.1) be conducted prior to any dredging operations<br />
(action S.1.2) so that the rate of infilling can be monitored for future planning and cost/benefit analyses.<br />
S.2.1<br />
Assess stormwater drains<br />
for impacts of sediment build-up<br />
S.2.2<br />
Dredge or excavate sediment build-up<br />
at stormwater drains identified in S.2.1<br />
Stormwater drains must be assessed and prioritised (action S.2.1) prior to dredging or excavation works (action<br />
S.2.2) to remove excess sediment build-up that is impacting upon aquatic habitat.<br />