<strong>Wallis</strong> <strong>Lake</strong> <strong>Estuary</strong> <strong>Management</strong> Plan<br />

S.2<br />

<strong>Management</strong> Area A, C<br />

<strong>Management</strong> Objective<br />

Assess and remove excessive sediment build-up at stormwater drain outlets where necessary<br />

Action<br />

No<br />

S.2.1<br />

S.2.2<br />

Action<br />

Conduct an assessment of major stormwater drains to determine where<br />

sediment build-up is impacting on habitat quality or impeding passage and<br />

compromising the safety of waterway users<br />

Dredge or excavate sediment build-up at stormwater drains identified above<br />

(S.2.1)<br />

Indicative<br />

Cost<br />

$15,000 +<br />

staff time<br />

Priority Responsibilities Progress<br />

Medium (C4)<br />

GLC<br />

TBD Long-term (D5) GLC<br />

Comments<br />

Dredging operations or excavation works should not increase the risk to seagrass or other habitat of high conservation value or adversely impact upon water quality. <strong>The</strong>se<br />

actions should be conducted in concert with stormwater management and community education programs to reduce sediment loads entering the <strong>Lake</strong> and the need to conduct<br />

dredging operations in the future.<br />

[Plate 4.9: Sediment build-up at stormwater outlet in Forster Keys]<br />

60