<strong>Wallis</strong> <strong>Lake</strong> <strong>Estuary</strong> <strong>Management</strong> Plan<br />
S.2<br />
<strong>Management</strong> Area A, C<br />
<strong>Management</strong> Objective<br />
Assess and remove excessive sediment build-up at stormwater drain outlets where necessary<br />
Action<br />
No<br />
S.2.1<br />
S.2.2<br />
Action<br />
Conduct an assessment of major stormwater drains to determine where<br />
sediment build-up is impacting on habitat quality or impeding passage and<br />
compromising the safety of waterway users<br />
Dredge or excavate sediment build-up at stormwater drains identified above<br />
(S.2.1)<br />
Indicative<br />
Cost<br />
$15,000 +<br />
staff time<br />
Priority Responsibilities Progress<br />
Medium (C4)<br />
GLC<br />
TBD Long-term (D5) GLC<br />
Comments<br />
Dredging operations or excavation works should not increase the risk to seagrass or other habitat of high conservation value or adversely impact upon water quality. <strong>The</strong>se<br />
actions should be conducted in concert with stormwater management and community education programs to reduce sediment loads entering the <strong>Lake</strong> and the need to conduct<br />
dredging operations in the future.<br />
[Plate 4.9: Sediment build-up at stormwater outlet in Forster Keys]<br />