grounding clamps to determine cable lengths<br />

required to reach cable connectors. Mark<br />

cables to remove insulation and shield as<br />

described below:<br />

• For cables with foil shielding, strip insulation<br />

and foil from the cable half an inch (15 mm)<br />

past the grounding clamp (see Figure 2-2).<br />

Fold the foil shield back on the cable where<br />

the cable passes through the clamp. Ensure<br />

silver (conductive) side of foil is turned<br />

outward for contact with the grounding<br />

clamp.<br />

• For cables with braided shielding, strip cable<br />

insulation and braided shield from a point just<br />

past the grounding clamp. Strip another half<br />

inch (15 mm) of insulation only to expose the<br />

braid where the cable passes through the<br />

clamp (see Figure 2-2).<br />

2.3.3 Load Cells<br />

To attach cable from a load cell or junction box to an<br />

installed A/D card, route the cable through the cord<br />

grip and ground the shield wire as described in<br />

Section 2.3.2 on page 10.<br />

Next, remove connector J1 from the A/D card. The<br />

connector plugs into a header on the A/D card (see<br />

Figure 2-3). Wire the load cell cable from the load cell<br />

or junction box to connector J1 as shown in Table 2-1.<br />

Cord grip<br />

NOTE: Install lockwashers<br />

first, against enclosure,<br />

under grounding clamp<br />

Insulated cable<br />

Braid<br />

Cut insulation here<br />

for braided cables<br />

J1<br />

Foil (silver side out)<br />

Grounding clamp<br />

SIG+<br />

SIG–<br />

SEN+<br />

SEN–<br />

EXC+<br />

EXC–<br />

JP1 JP2<br />

Shield wire (cut)<br />

Cut insulation here<br />

for foil-shielded cables<br />

Figure 2-3. Single-Channel A/D Card<br />

Length of foil before folding<br />

back on cable insulation<br />

Figure 2-2. Grounding Clamp Attachment for Foil-Shielded<br />

and Braided Cabling<br />

• For load cell cables, cut the shield wire just<br />

past the grounding clamp. Shield wire<br />

function is provided by contact between the<br />

cable shield and the grounding clamp.<br />

• Route stripped cables through cord grips and<br />

clamps. Ensure shields contact grounding<br />

clamps as shown in Figure 2-2. Tighten<br />

grounding clamp nuts.<br />

• Finish installation using cable ties to secure<br />

cables inside of indicator enclosure.<br />

If using 6-wire load cell cable (with sense wires),<br />

remove jumpers JP1 and JP2 before reinstalling<br />

connector J1. For 4-wire installation, leave jumpers<br />

JP1 and JP2 on. For 6-wire load cell connections on<br />

dual-channel A/D cards, remove jumpers JP3 and JP4<br />

for connections to J2.<br />

When connections are complete, reinstall load cell<br />

connector on the A/D card and use two cable ties to<br />

secure the load cell cable to the inside of the<br />

enclosure.<br />

A/D Card<br />

Connector Pin<br />

Function<br />

1 +SIG<br />

2 –SIG<br />

3 +SENSE<br />

4 –SENSE<br />

5 +EXC<br />

6 –EXC<br />

• For 6-wire load cell connections to connector J1, remove<br />

jumpers JP1 and JP2.<br />

• For 6-wire load cell connections to connector J2 (dual A/D<br />

cards), remove jumpers JP3 and JP4.<br />