– StandbyDelay: Setting the period of time in standby operation after which an automatic<br />

cylinder draining takes place.<br />

Factory setting: 72 hours<br />

Setting range: 1...720 hours<br />

– Force Drain: Activating/Deactivating the forced draining which takes place after a certain<br />

time of operation. The forced draining takes place also during steam<br />

production.<br />

Factory setting: Off<br />

Options:<br />

On (Forced draining activated)<br />

Off (Forced draining deactivated)<br />

– Force Delay: Setting the time of operation after which a forced draining takes place.<br />

Factory setting: 72 hours<br />

Setting range: 1...720 hours<br />

6.6.4.10 Performing remote relay tests<br />

Settings<br />

GFCI-Mode :Aus<br />

Water Manag.:Set<br />

Remote Test :Set<br />

Bath Test :Set<br />

Contrast :15<br />

Esc<br />

Set<br />

Select “Remote Test” in the settings menu, then press the key.<br />

Remote Test<br />

Remote Steam:<br />

Off<br />

Esc<br />

Set<br />

Remote Service:<br />

Off 12.00.00<br />

Remote Error:<br />

Off<br />

Remote Unit On:<br />

On.11.2006 12.00.00<br />

The list with the remote relay tests appears, the first relay test is<br />

shown.<br />

Press the < > and < > keys in order to select the further relay tests<br />

available and press the key to activate/deactivate the corresponding<br />

relay for testing.