19.01.2015 Views

OPERATING AND MAINTENANCE INSTRUCTIONS Small Compact ...

OPERATING AND MAINTENANCE INSTRUCTIONS Small Compact ...

OPERATING AND MAINTENANCE INSTRUCTIONS Small Compact ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Option MDE 40<br />

A<br />

After cooler<br />

The after cooler is required for drying with very<br />

high temperatures (approx. > 120 °C).<br />

The cooler the return air temperature, the better<br />

the air absorption of the return air, i.e. efficiency<br />

of the drying system increases.<br />

The return air from the drying bins passes<br />

through the heat exchanger (1, Fig. A-1).<br />

1<br />

2<br />

The heat exchanger is cooled by the cooling air<br />

of the filter fan (2) during the entire time of<br />

operation.<br />

Fig. A-1<br />

After cooler<br />

Maintenance<br />

Clean the after cooler every three months.<br />

In case very dusty material is dried, clean the after cooler more often.<br />

Spare parts<br />

Spare parts<br />

Item No. off Designation Part no.<br />

- 1 After cooler, complete 501 459<br />

1 1 Heat exchanger 407 573<br />

2 1 Filter fan 403 652<br />

A.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!