Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
METRO 0.5 to 1.5<br />
Maintenance and repair 9<br />
Maintenance and cleaning<br />
Note<br />
The screen filter clogs up faster when regrind material is transported.<br />
Reduce cleaning intervals appropriately.<br />
9.4.2 Check inlet flap<br />
Fig. 9.4 – Check inlet flap<br />
[1] Check inlet flap<br />
Prepare the hopper <strong>loader</strong> for maintenance (see "Before starting work" on Page 32).<br />
Remove the screen filter (see "Clean screen filter." on Page 33).<br />
Check the inlet flap [1] for wear (see arrows in the magnified view).<br />
Edition: November 2005 35