19.01.2015 Views

Operating Manual Hopper loader

Operating Manual Hopper loader

Operating Manual Hopper loader

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11 Option<br />

Implosion filter option METRO 0.5 to 1.5<br />

11.1.3 Maintenance<br />

Fig. 11.2 – Implosion filter<br />

[1] Nut<br />

[2] Sealing ring<br />

[3] Cover plate of implosion filter<br />

[4] Implosion filter<br />

[5] Spacer<br />

[6] Seal<br />

[7] Cable passage<br />

[8] Plug connector<br />

Removing implosion filter<br />

Prepare the hopper <strong>loader</strong> for maintenance (see "Before starting work" on Page 32).<br />

Label the PU tubes to the implosion filter and undo the PU tubes.<br />

Remove the plug connector [8].<br />

Slacken the nut [1] and remove the sealing ring [2].<br />

Remove the cover plate of the implosion filter [3] and pull the implosion filter [4] off.<br />

Remove the spacer [5] and the seal [6].<br />

Installing implosion filter<br />

Assemble in reverse order.<br />

Make sure that the PU tubes are correctly installed.<br />

44 Edition: November 2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!