19.01.2015 Views

Operating Manual Hopper loader

Operating Manual Hopper loader

Operating Manual Hopper loader

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METRO 0.5 to 1.5<br />

Maintenance and repair 9<br />

Repair work<br />

Assembling modules<br />

Attach the ground clamp [2].<br />

Place the seal [3] on the contact surface of the bottom module.<br />

Position the module.<br />

Position the profile clamp [1] and fasten the clamp with screw [4] (also the ground for glass units<br />

[6]).<br />

9.5.2 Replacing vacuum valve<br />

Material damage!<br />

Parts which fall into the unit may cause operational faults.<br />

CAUTION!<br />

Make sure that no parts fall into the unit.<br />

Cover the opening of the machine and bin.<br />

Fig. 9.6 – Vacuum valve<br />

[1] Hexagonal nut<br />

[2] Implosion valve<br />

[3] Spacer rod<br />

[4] Contact surface of the spacer rod<br />

[5] Sealing disk<br />

[6] Vacuum seal<br />

[7] Hexagon-headed screw M6<br />

[8] Spring<br />

[9] Piston rod<br />

[10] Contact surface of the piston rod<br />

[11] Pneumatic cylinder<br />

Removal<br />

Prepare the hopper <strong>loader</strong> for maintenance (see "Before starting work" on Page 32).<br />

Edition: November 2005 37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!