- Page 1: DEPARTMENT OF ENERGY OF THE REPUBLI
- Page 5 and 6: 5 Marking Name Page 1588-ПЗ-ОИ4
- Page 7: 7 Marking Name Page 1588-ПЗ-ОИ4
- Page 11 and 12: 1 TERMS AND DEFINITIONS 11 EP (emer
- Page 13 and 14: Breeder — Breeder-type reactor. 1
- Page 15 and 16: 15 Fissible material — material c
- Page 17 and 18: 17 Isotope — nuclear form of the
- Page 19 and 20: 19 Curie (Ci) — off-system unit o
- Page 21 and 22: 21 Medical irradiation — irradiat
- Page 23 and 24: 23 reactiveness influence means and
- Page 25 and 26: 25 Radium — product of radioactiv
- Page 27 and 28: 27 X-ray — off-system unit of mea
- Page 29 and 30: 29 Heavy-water reactor — nuclear
- Page 31 and 32: 31 Ecological security — conditio
- Page 33 and 34: ITER - International Thermonuclear
- Page 35 and 36: 35 Analysis and generalization of i
- Page 37 and 38: 3 GENERAL. JUSTIFICATION OF THE NEC
- Page 39 and 40: 39 dents) in the byelorussian NPP,
- Page 41 and 42: 41 pensating increase of gas consum
- Page 43 and 44: 43 In order to follow these directi
- Page 45 and 46: Table 3 - Comparative characteristi
- Page 47 and 48: Table 4 - Characteristics of constr
- Page 49 and 50: Table 5 - Analysis of competing sit
- Page 51 and 52: Continuation of table 5 51 Factors
- Page 53 and 54: Continuation of table 5 53 Factors
- Page 55 and 56: Continuation of table 5 55 Factors
- Page 57 and 58: 57 heat reactors are being led. Ros
- Page 59 and 60:
59 made of a special type of glass.
- Page 61 and 62:
61 Atomic branch in Russia is not t
- Page 63 and 64:
63 Generation 3 Reactors of generat
- Page 65 and 66:
65 less with lower temperature and
- Page 67 and 68:
Table 10 - Main parameters of diffe
- Page 69 and 70:
69 been started in Bulgaria and fou
- Page 71 and 72:
71 characteristics, safety and stab
- Page 73 and 74:
73 of project NPP -92 to the requir
- Page 75 and 76:
75 Apart from the procedure of lice
- Page 77 and 78:
77 − reactor building with double
- Page 79 and 80:
79 The second circuit is nonradioac
- Page 81 and 82:
Continuation of table 16 81 Auxilia
- Page 83 and 84:
83 cooling of active zone melting o
- Page 85 and 86:
85 Figare 9 - Longitudinal plan of
- Page 87 and 88:
87 TVS-2M construction (figure 10)
- Page 89 and 90:
89 carcass, increased height of CDP
- Page 91 and 92:
91 FA-2 and FA-2M carcasses are tes
- Page 93 and 94:
93 Figure 17 - Shank end with long
- Page 95 and 96:
Figure 22 - Cells and a part of mix
- Page 97 and 98:
- Page 99 and 100:
99 Figure 24 - Main circulating agg
- Page 101 and 102:
101 two types in front of LPC provi
- Page 103 and 104:
Table 22 - Required time reserves 1
- Page 105 and 106:
105 By its technologies and structu
- Page 107 and 108:
Figure 25 - Deep echeloning protect
- Page 109 and 110:
109 To carry out security requireme
- Page 111 and 112:
111 1. реактор - reactor 2.
- Page 113 and 114:
Figure 27 - Principle solutions on
- Page 115 and 116:
115 Melting localization device The
- Page 117 and 118:
117 Corium localization device is a
- Page 119 and 120:
119 - system of diesel generators;
- Page 121 and 122:
121
- Page 123 and 124:
123 − providing straight main lin
- Page 125 and 126:
125 Figure 31 - General plan of NPP
- Page 127 and 128:
7.1 Construction of atomic station
- Page 129 and 130:
129 As we can see from table 28 at
- Page 131 and 132:
131 Figure 33 - PWR reactor nodes o
- Page 133 and 134:
133 noncompactness and getting of g
- Page 135 and 136:
25000 20000 15000 10000 5000 0 -500
- Page 137 and 138:
137 Table 30 - Sources of chemical
- Page 139 and 140:
139 - ASF cleaning water (200 mck);
- Page 141 and 142:
7.4 Radiation impact 141 7.4.1Outpu
- Page 143 and 144:
143 7.4.2 Dumping of radioactive su
- Page 145 and 146:
145 Volumes of liquid dumps into th
- Page 147 and 148:
147 Quality and quantitative radioa
- Page 149 and 150:
149 equipped with aerosol and iodin
- Page 151 and 152:
151 - because of absence of public
- Page 153 and 154:
153 mined by calculations according
- Page 155 and 156:
155 - worked-out cassettes are move
- Page 157 and 158:
9 RADIATION PROTECTION 9.1 Radiatio
- Page 159 and 160:
159 - organization of radiation and
- Page 161 and 162:
161 Continuation of table 43 NPP wi
- Page 163 and 164:
163 - systems of electro supply, he
- Page 165 and 166:
165 ecologically secure. For exampl
- Page 167 and 168:
167 side the grout can be required.
- Page 169 and 170:
Table 45 - Development of heavy OA
- Page 171 and 172:
171 Within 5-7 km from the NPP OA o
- Page 173 and 174:
173 sites are: Bykhov and Shklov-Go