19.01.2015 Views

6 - Kuwait Oil Company

6 - Kuwait Oil Company

6 - Kuwait Oil Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

safety systems in its oil<br />

operations as one of<br />

the strategic goals that<br />

the <strong>Company</strong> is keen to<br />

preserve and promote.<br />

We are sure that our<br />

contractors are as keen<br />

as us in applying HSE<br />

systems, and that they<br />

spare no effort in working<br />

side by side with us to<br />

achieve this purpose as it<br />

is a shared responsibility<br />

which rests with all<br />

concerned parties.”<br />

The Chairman then<br />

thanked the audience<br />

and said that it was his<br />

hope that KOC and its<br />

contractors would do<br />

everything in their power<br />

to renew their commitment<br />

to support the bonds<br />

of mutual cooperation<br />

between the participants<br />

to serve common interests<br />

and achieve desired goals.<br />

The floor was then given<br />

to KNPC’s Bakhit Al-<br />

Rashidi, Deputy Managing<br />

Director for Planning<br />

and Local Marketing.<br />

During his speech to<br />

the audience, Al-Rashidi<br />

upheld the importance<br />

The KOC C&MD delivers his opening address.<br />

of the Town Hall Meeting<br />

and Exhibition, calling<br />

it “constructive” and<br />

“rewarding for the oil<br />

sector companies and<br />

suppliers.” He maintained<br />

that the meeting and<br />

exhibition does much<br />

in the way of building<br />

the relationships and<br />

tools necessary to<br />

enhance future business<br />

prospects for all<br />

involved with <strong>Kuwait</strong>’s<br />

oil and gas industry.<br />

Al-Rashidi then told the<br />

audience about a number<br />

of projects KNPC was<br />

currently engaged in,<br />

particularly the two mega<br />

projects which include the<br />

New Refinery at Zour and<br />

the Clean Fuels Project<br />

in Mina Abdullah. In<br />

regard to these projects,<br />

Al-Rashidi maintained<br />

that “two state-of-the-art<br />

refining plants will emerge<br />

in 2017 and 2018 with<br />

a total throughput of<br />

1.4 million barrels of<br />

crude oil per day.” This,<br />

he said, will shape the<br />

future of <strong>Kuwait</strong>’s oil<br />

refining industry over<br />

the coming decades.<br />

In addition, the KNPC<br />

DMD referred to the<br />

Town Hall Meeting as a<br />

“vital opportunity for face<br />

to face communication<br />

between work partners to<br />

further enhance mutual<br />

cooperation.” He added<br />

that “Cooperation with<br />

international partners<br />

who have the know-how,<br />

the expertise and the<br />

technology but above<br />

all the commitment to<br />

honor their obligations<br />

is embedded in our<br />

principles, and we strongly<br />

believe that international<br />

expertise is essential for<br />

upgrading local skills<br />

while indigenous human<br />

resources & facilities<br />

should seize every<br />

possibility to benefit from<br />

interaction with multinational<br />

experiences.”<br />

Al-Rashidi also told the<br />

audience that KNPC was<br />

committed to providing<br />

local contractors with<br />

opportunities to “receive<br />

their deserved share<br />

of the huge business<br />

emanating from the<br />

scores of sustainability<br />

projects launched by KPC<br />

and its subsidiaries.”<br />

He then concluded his<br />

speech by thanking<br />

KOC for the hospitality<br />

provided and commended<br />

the company for hosting<br />

such an organized and<br />

beneficial event.<br />

Following the KNPC<br />

DMD’s speech, Ibrahim<br />

Faraj, Commercial<br />

Support Group Manager<br />

from KOC, delivered<br />

his opening address.<br />

The KOC Manager<br />

told the audience that<br />

the <strong>Company</strong> does<br />

much in the way of<br />

ensuring that important<br />

projects are completed<br />

by qualified and<br />

experienced contractors<br />

and suppliers who can<br />

meet the requirements<br />

of the very sensitive oil<br />

and gas industry.<br />

The KOC Manager<br />

went on to say that the<br />

selection process requires<br />

KOC to make sure of the<br />

efficiency of contractors<br />

and suppliers in order<br />

to maintain the safety<br />

and efficiency of oil<br />

facilities and to avoid<br />

exposing them to risk<br />

due to contracting with<br />

incompetent businesses.<br />

He added that a<br />

significant qualification<br />

for contractors is that they<br />

operate in accordance<br />

with the conditions and<br />

standard specifications,<br />

particularly HSE<br />

requirements, so as to<br />

ensure their abilities<br />

while being able to carry<br />

out their contractual<br />

responsibilities.<br />

“From this standpoint,<br />

KOC has taken several<br />

steps to attract local<br />

and international<br />

contractors and suppliers<br />

for qualification and<br />

competition. The<br />

<strong>Company</strong> develops its<br />

contracts in order to<br />

reduce risks to contractors<br />

and to motivate them as<br />

well. At the same time, it<br />

has formed a specialized<br />

team to handle the<br />

qualification operations<br />

8<br />

April - June 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!